IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2. The Berry Line Over -The -Top pipe shall be taken out of service and the ends capped <br />outside the window from May 1st and Sept 30th. The Berry Line Over -The -Top pipe must be <br />taken out of service after the Berry Line and Bypass Connection Line is completed. Provide <br />a minimum of 30 days notice to the Engineer to schedule this work. The Berry Line and <br />Bypass Line have an allowable shutdown time of 48 hrs. Lastly, this work cannot occur if <br />the forecasted outside temperature may reach 90 degrees Fahrenheit or above. <br />3. The Evergreen and Alderwood Surge Line pipe shall be taken out of service outside the <br />window from May 1st and Sept 30th. The Evergreen and Surge Line Connections must be <br />completed at the end of the project when Reservoir 3 is being taken offline and Reservoir <br />3A is put into service. Provide a minimum of 30 days notice to the Engineer to schedule <br />this work. The Alderwood and Evergreen Surge Lines have an allowable shutdown time of <br />48 hrs. Lastly, this work cannot occur if winds in excess of 10 miles per hour have been <br />forecasted to occur at any time in the shutdown duration plus an additional day following <br />the shutdown. <br />4. In order to construct the Bypass Line to AWWD PS 2 connection, the City needs to drain <br />parts of the system piping before connections to existing pipes can be made. Provide a <br />minimum of 30 days notice to the Engineer to schedule this work. This piping work must <br />occur outside the window from May 1st and September 30th. Connections to existing pipes <br />must take less than 48 hours, defined by the time the pipe is taken out of service, to being <br />placed back into service following satisfactory testing and disinfection. Lastly, this work <br />cannot occur if the forecasted outside temperature may reach 90 degrees Fahrenheit or <br />above. <br />END OF SECTION <br />Reservoir 3 Replacement Phase 1 WORK SEQUENCE March 2024 <br />Work Order No. UP3739 01 12 16 <br />