IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SECTION 01 22 00 <br />MEASUREMENT AND PAYMENT <br />1.01 SUMMARY <br />A. Measurement and payment will be on a lump sum or unit price basis in accordance with the <br />prices set forth in the Bid Form. A Force Account item is included for the use of the Owner. <br />Where work is required but does not appear as a separate item in the proposal, the cost for that <br />work shall be included in the bid items in the Bid Form. <br />B. Section includes: <br />1. Measurement for Lump Sum and Unit Price items. <br />2. Payment for Lump Sum and Unit Price items. <br />3. Schedule of Lump Sum and Unit Price items. <br />4. One Force Account item. <br />C. Measurement: <br />1. Measurement by weight: Weigh on commercial calibrated truck scale per WSDOT 1-09.2. <br />Weigh tickets must include time of weighing. <br />2. Measurement by area: Measurement by area shall include the affected area as measured <br />by the Owner's Representative. <br />3. Measurement by length: Measurement by length will be the number of linear feet of <br />completed installation measured along the centerline of pipe through fittings, valves and <br />couplings. Limits of measurement shall be from the centerline of couplings, valves, fitting, <br />and manholes. <br />4. Measurement by volume: Measure volume using the average -end -area method. All or <br />some computations may be based upon excavation measurements and other data <br />measured at the point of loading for excavated material or delivery for imported material. <br />Hauling vehicles may be of any size or type provided that the body is of such shape that <br />the actual contents and volumes may be readily and accurately determined. If the Owner's <br />Representative requires, the Contractor shall level loads to facilitate measurement. <br />D. Payment <br />1. Unit Price payment will be made at the Unit Price indicated on the Bid form for the quantity <br />of each item measured and incorporated into the Work. Payment will be the Unit Price <br />multiplied by the measured quantity. <br />2. Lump Sum payment will be paid at the price indicated on the Bid Form using the methods <br />specified herein. <br />3. One item is a Force account. <br />4. All other work required to complete the Work specified in the Contract Documents, but not <br />indicated specifically as a pay item, shall be considered necessary and incidental work. <br />5. The Contract contains bid item quantities to provide a common Proposal for Bidders. In <br />accordance with WSDOT Section 1-04.6, no cost adjustments will be made for any <br />variation in the bid item quantities except as specified elsewhere in the Contract <br />Documents. <br />Bid Item 1 - MOBILIZATION, BONDS, DEMOBILIZATION <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid price for this bid item shall be full compensation for all preconstruction costs of <br />preparatory work and operations including, but not limited to, those necessary for the movement <br />of personnel, equipment, supplies and incidentals to the Project; for the establishment of temporary <br />utilities, offices ,and other facilities necessary for Work on this Project; for preparation of material <br />storage areas, stock pile areas, and other temporary improvements, work for premiums on bonds, <br />permits, and insurance for the Project, and for Work and operations that he must perform or costs <br />that must incur before beginning and at the completion of production work on the various items on <br />the Project. This bid item also includes, but is not limited to, posting construction identification signs, <br />securing permits, establishing safety and security measures, preparing a traffic control plans, <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 01 22 00 <br />MEASUREMENT AND PAYMENT March 2024 <br />