IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
8. Construction Support, Project Management, and Administrative Cost Elements: <br />a. Costs under this category are sometimes informally referred to as field overhead, but <br />are Project costs rather than costs related to Contractor's general business operations. <br />b. Include in the Schedule of Values relevant line items and amounts for work and <br />services required by the General Conditions and specific Division 01 specifications <br />sections, such as: <br />1) Project management costs. <br />2) Onsite superintendence and supervision costs. <br />3) Itemized list of Work by work area for costs associated with coordination with the <br />Owner's and AWWD's operations (all three pump stations and existing Reservoir <br />3), including required sequencing. <br />4) Updating the construction Progress Schedule, preparing time impact analyses, and <br />preparing recovery schedules. Preparation of the preliminary Progress Schedule <br />and the initial baseline Progress Schedule acceptable to Engineer are part of <br />mobilization. <br />5) Construction progress photographic documentation. Preconstruction photographic <br />documentation and final photographic documentation are, respectively, part of <br />mobilization and demobilization. <br />6) Updates of the Schedule of Submittals. <br />7) Contractor's safety representative and ongoing implementation of Contractor's <br />Site -specific health and safety plan (SSHASP). Establishing the SSHASP is part of <br />mobilization. <br />8) Ongoing compliance with permits. Contractor's securing of required work permits <br />is part of mobilization. <br />9) Ongoing cost for temporary utilities and temporary facilities. Establishing such <br />services and facilities is part of mobilization. <br />10) Ongoing costs for temporary security . <br />11) Field offices (monthly rental and maintenance) and storage facilities (excluding <br />costs of establishment and removal, which are part of mobilization and <br />demobilization). <br />12) Ongoing site maintenance, such as temporary controls (dust, air pollution, water <br />pollution, solid waste control, pest and rodent control, temporary erosion and <br />sediment controls, and others), snow and ice removal, and similar activities. <br />13) Field engineering and surveying. <br />14) Progress cleaning and cleaning for Substantial Completion. <br />15) Record documents (preparation, maintenance, and submittal). <br />a) If adequate record documents are maintained, up to 50 percent of the value of <br />the record documents line item will be eligible for payment, spread evenly over <br />those progress payments in which construction at the Site is performed. <br />b) Remainder of Project record documents line item will be eligible for payment <br />when complete record documents are submitted. <br />c) If record documents submitted are unsatisfactory to Engineer, amount may be <br />reduced via set -offs. <br />16) Other items required by Engineer. <br />c. Include such items in Applications for Payment on payment schedule acceptable to <br />Engineer. <br />d. Such line items in the Schedule of Values shall exclude any and all costs associated <br />with Contractor's permanent place of business, personnel stationed at permanent <br />offices, salaries and bonuses of executive and administrative personnel not directly <br />performing work on the Project, and general business expenses, all of which are part of <br />Contractor's overhead costs. <br />1) Other mobilization acceptable to Engineer. <br />9. Submittals and Field Quality Control Payment: <br />a. Submittals: Up to 8 percent of cost (including all associated overhead and profit) of <br />each equipment item, exclusive of transportation and installation costs associated <br />therewith, may be allocated to preparation of Shop Drawings, Samples ,and other <br />Submittals required for release for purchase, fabrication, or delivery and may be <br />included in the application for payment following Engineer's approval of Shop Drawings <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 01 29 73 <br />SCHEDULE OF VALUES March 2024 <br />