Laserfiche WebLink
(and acceptance of other Submittals, as applicable) required for fabricating or <br />purchasing for that item for the Work. <br />b. Field Quality Control: Up to 3 percent of total cost of each item (including all <br />associated overhead and profit), including materials and equipment, and installation, <br />may be apportioned to specified or required field quality control activities (including <br />required testing and inspections) and included in the application for payment following <br />Engineer's acceptance of the associated written field quality control report submittals. <br />PART 2 PRODUCTS - (NOT USED) <br />PART 3 EXECUTION - (NOT USED) <br />END OF SECTION <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 01 29 73 <br />SCHEDULE OF VALUES March 2024 <br />