My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SECTION 01 32 16 <br />CONSTRUCTION PROGRESS SCHEDULE <br />PART1 GENERAL <br />1.01 SUMMARY <br />A. Section Includes administrative and procedural requirements for Contractor's Construction <br />Progress Schedules. <br />1.02 SUBMITTALS <br />A. Procedures: Section 01 33 00. <br />B. Submit to Engineer the Construction Progress Schedule in the form and quantity required in <br />Section 01 33 00 - Submittals, and as required for electronic communications. <br />C. Construction Progress Schedule: <br />1. Submit a preliminary Construction Progress Schedule. <br />2. Revise the preliminary Construction Progress Schedule in accordance with Engineer's <br />comments to create the final (aka baseline) Construction Progress Schedule. <br />3. Contractor will not be eligible for progress payment until the baseline Construction Progress <br />Schedule is acceptable to Engineer. <br />4. Not less than 10 days before submission of the first Application for Payment, a conference, <br />attended by Contractor, Engineer, and others as appropriate, will be held to review the <br />preliminary Construction Progress Schedule submitted. Promptly after the conference, <br />Contractor shall revise the preliminary Construction Progress Schedule, in accordance with <br />Engineer's comments, and submit to Engineer the acceptable Construction Progress <br />Schedule. <br />5. Updates: Submit updated Construction Progress Schedule when: <br />a. The Contract time has changed. <br />b. Requested by Engineer. <br />D. Qualifications Statements <br />E. Planned Work Schedule with Constraints <br />F. Progress Schedule <br />G. Look -Ahead Schedules <br />H. Progress Schedule Updates <br />I. Time Impact Analyses <br />J. Recovery Schedules <br />1.03 REFERENCES. <br />A. Defined Terms: <br />1. "Activity" is an element of the Work that has the following specific characteristics: <br />consumes time, requires resources, has a definable start and finish, is assignable, and is <br />measurable. <br />2. "Baseline Progress Schedule" means, in addition to the General Conditions' definition of <br />"Progress Schedule", the version of the Progress Schedule for the entire Project, initially <br />accepted by the Engineer. In the event of subsequent modifications to the Project, <br />Contractor and Engineer may mutually agree that a subsequent revision of the Progress <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 01 32 16 <br />CONSTRUCTION PROGRESS SCHEDULE March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.