My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 11:19:41 AM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SECTION 00 21 13 <br />INSTRUCTIONS TO BIDDERS <br />1-00 INTRODUCTORY MATTERS <br />General Description and Location of Project <br />The Work to be performed will include furnishing all labor, materials and equipment necessary to perform <br />all Work as required by the Contract in accordance with the Contract Documents. <br />This Phase 1 project is located within the City of Everett at the Reservoir 3 site at 6107 Berkshire Dr Everett, <br />WA 98203. The site also contains three pump stations and the existing 20-MG covered reservoir The Phase <br />1 project also includes two pipe connections east of Reservoir 2 at the intersection of Tulalip and Charles <br />Avenue and the intersection of Federal and Edward Avenue. <br />Project Manager <br />Questions and inquiries about these Contract Documents should be directed in writing to the attention of <br />Souheil Nasr at the City of Everett. SNasr@everettwa.gov, (425) 257-7210. <br />Standard Specifications <br />The following other Specifications and Standard Plans shall apply only to the extent that they are called <br />out in the Contract Documents. <br />• WSDOT "Standard Specifications for Road, Bridge and Municipal Construction", hereinafter <br />referred to as the "Standard Specifications" latest edition. <br />• City of Everett "Design and Construction Standards and Specifications" (Revised January 2018), <br />as found online on the City's Website at: https://everettwa.gov/1531/Design-Construction- <br />Standards <br />• "Standard Plans for Road and Bridge Construction," latest edition as prepared by WSDOT. <br />• "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition. <br />• APWA Standards, latest edition. <br />• AWWA Standards, latest edition. <br />• American Concrete Institute (ACI), latest edition <br />1-01 DEFINITIONS AND TERMS <br />1-01.3 Definitions <br />Definitions are found in SECTION 00 72 00 GENERAL CONDITIONS and elsewhere in the <br />specifications. <br />1-02 BID PROCEDURES AND CONDITIONS <br />1-02.1 Bidder Responsibility Criteria <br />1-02.1(1) Mandatory Bidder Responsibility Criteria <br />Bidder shall meet mandatory responsibility criteria in accordance with RCW 39.04.350(1). The <br />City may require Bidder to submit documentation demonstrating compliance with the criteria <br />under this 1-02.1(1). Bidder must: <br />1. Registration. At the time of bid submittal, have a certificate of registration in <br />compliance with chapter 18.106 RCW, an elevator contractor license in compliance <br />with chapter 70.87 RCW, or an electrical contractor license in compliance with chapter <br />19.28 RCW, as required under the provisions of those chapters; and <br />2. UBI. Have a current Washington Unified Business Identifier (UBI) number; and <br />3. State Requirements. If applicable: <br />a. Have Industrial Insurance (workers' compensation) coverage for the bidder's <br />employees working in Washington, as required in Title 51 RCW; <br />b. Have a Washington Employment Security Department number, as required in Title <br />50 RCW; and <br />c. Have a Washington Department of Revenue state excise tax registration number, <br />as required in Title 82 RCW. <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 21 13 <br />INSTRUCTIONS TO BIDDERS March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.