Laserfiche WebLink
1-02.4(1)B Prevailing Wages <br />Bidder is directed to the Contract Documents for requirements regarding applying payment <br />of prevailing wage rates for employment of labor on within Snohomish County. <br />All laborers, workmen, or mechanics in each trade or occupation employed in the <br />performance of the Contract either by Contractor, Subcontractor, or other person doing <br />Work shall be paid not less than the prevailing rate of wage as defined in RCW 39.12.010. <br />Current prevailing wage rates may be found online at <br />http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/. The rules and regulations <br />noted within the Contract Documents are available from: <br />State of Washington Department of Labor and Industries <br />Prevailing Wage Section <br />PO Box 44540 <br />Olympia, WA 98504-4540 <br />(360) 902-5335 <br />pw1@lni.wa.gov <br />Bidders are advised to examine and to be thoroughly familiar with such requirements. No <br />claim for additional compensation will be allowed that is based upon a lack of knowledge of <br />these requirements or a failure to include adequate increases in such wages over the term <br />of this Contract in the Bidder's Bid. <br />1-02.4(2) Subsurface Information <br />If the City has made subsurface investigation of the site of the proposed Work, the boring <br />log data and soil sample test data accumulated by the City will be made available for <br />inspection by the Bidders. The boring logs and soil sample test data shall NOT be <br />considered as part of the Contract. In addition, the City makes no representation or <br />warranty expressed or implied that: <br />1. The Bidders' interpretations from the boring logs are correct, <br />2. Moisture conditions and indicated water tables will not vary from those found at <br />the time the borings were made, and <br />3. The ground at the location of the borings has not been physically disturbed or <br />altered after the boring was made. <br />The City specifically makes no representations, guarantees, or warranties as to the <br />condition, materials, or proportions of the materials between the specific borings regardless <br />of any subsurface information the City may make available to the prospective Bidders. <br />The boring log data and soil sample data, if any, are included as the appendixces to the <br />bid documents. <br />1-02.5 Bid Form <br />The City reserves the right to arrange the bid forms with alternates and additives, if such be to the <br />advantage of the City. The Bidder shall bid on all alternates and additives set forth in the Bid Form <br />unless otherwise specified. <br />1-02.6 Preparation of Bid <br />Bids shall be submitted on the forms provided by the City and found in the Contract Documents. <br />All blank spaces in the Bid form shall be legibly filled in using a non -erasable medium. Do not <br />qualify Bids, since this will automatically be cause for rejection of the Bid. <br />A Bid will be rejected if the authorized Bid form furnished by the City is not used. <br />Bid prices shall include everything necessary for the completion of the Work including, but not <br />limited to, providing the materials, equipment, tools, plant and other facilities, and the management, <br />superintendence, labor, and all necessary engineering, design, and testing services. <br />Bidders are warned against making erasures or alterations of any kind to the Bid Form, and bids <br />that contain omissions, erasures, or irregularities of any kind may be rejected. No oral, telegraphic, <br />electronic, or telephonic bids or modifications will be considered. <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 21 13 <br />INSTRUCTIONS TO BIDDERS March 2024 <br />