My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 11:19:41 AM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1-03 AWARD AND EXECUTION OF CONTRACT <br />1-03.1 Consideration of Bids <br />Bids will be evaluated by the City to determine which bid is the lowest responsive bid by a <br />responsible bidder and which bid, if any, should be accepted in the best interest of the City. The <br />right is reserved by the City to waive informalities in the bidding, accept a Bid of the lowest <br />responsible Bidder, reject any or all Bids, republish the call for Bids, revise or cancel the Work, or <br />require the Work to be done in another way if the best interest of the City is served. <br />Within 5 days after the opening of Bids (or such longer time as the City may grant in writing), a <br />Bidder who wishes to claim error shall submit a notarized affidavit signed by the Bidder, <br />accompanied by original work sheets used in the preparation of the Bid, requesting relief from the <br />responsibilities of Award. The affidavit shall describe the specific error(s) and certify that the work <br />sheets are the originals used in the preparation of the Bid. The Engineer will review the certified <br />work sheets to determine the validity of the claimed error and make recommendation to the City. <br />If the City concurs in the claim of error, the Bidder will be relieved of responsibility, and the bid <br />deposit of the Bidder will be returned. Thereafter, at the discretion of the City, all Bids may be <br />rejected or Award made to next lowest and responsive Bidder. <br />1-03.1(2) Preference for Resident Contractors <br />In accordance with RCW 39.04.380, if a Bid is received from a nonresident contractor from a <br />state that provides a percentage bidding preference and does not have an office located in <br />Washington, then a comparable percentage disadvantage will be applied to the Bid of that <br />nonresident contractor. <br />1-03.1(3) Tie Bids <br />After opening Bids, if two or more lowest responsive and responsible Bid totals are exactly equal, <br />then the tie -breaker will be determined by drawing as described in this section. Two or more slips <br />of paper will be marked as follows: one marked "Winner" and the other(s) marked "unsuccessful". <br />The slips will be folded to make the marking unseen. The slips will be placed inside a box. One <br />authorized representative of each Bidder shall draw a slip from the box. Bidders shall draw in <br />alphabetic order by the name of the firm as registered with the Washington State Department of <br />Licensing. The slips shall be unfolded and the firm with the slip marked "Winner" will be <br />determined to be the successful Bidder and eligible for Award of the Contract. Only those Bidders <br />who submitted a Bid total that is exactly equal to the lowest responsive Bid are eligible to draw. <br />1-03.2 Award of Contract <br />Within 60 days after the opening of Bids, the City will act either to accept the Bid from the lowest <br />responsive, responsible Bidder, or to reject all Bids. The City reserves the right to request <br />extensions of such Bid acceptance period. If the lowest responsible Bidder and the City cannot <br />agree on an extension by the 60 day deadline, the City reserves the right to award the Contract to <br />the next lowest responsible Bidder or reject all Bids. <br />The acceptance of a Bid will be evidenced by a written Notice of Award of Contract delivered in <br />person or by certified mail to the Bidder whose Bid is accepted, together with a request to furnish <br />the Performance and Payment Bonds. and evidence of insurance and to execute the Contract set <br />forth in the Contract Documents. No Contract is formed until the Contract Execution Date. <br />1-03.3 Execution of Contract <br />Within 3 calendar days of receiving Notice of Award (not including Saturdays, Sundays and <br />Holidays), the successful Bidder shall provide to the City the information necessary to execute the <br />Contract electronically. This information shall include contact information, including the full name, <br />title, email address, and phone number for the authorized signer of the Bidder. <br />Successful Bidder has 14 calendar days after receiving the Notice of Award to complete the <br />following: <br />• Execute the Contract upon receipt from the City's AdobeSign System. <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 21 13 <br />INSTRUCTIONS TO BIDDERS March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.