My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 11:19:41 AM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2. A Proposal may be considered irregular and may be rejected if: <br />a. If the Bid Form includes unit prices, the Bidder's Bid Form does not include a unit <br />price for every Bid item; <br />b. If the Bid Form includes unit prices, any of the Bidder's unit prices are excessively <br />unbalanced (either above or below the amount of a reasonable Bid) to the potential <br />detriment of the City, as determined by the City; <br />c. Receipt of Addenda is not acknowledged; <br />d. A member of a joint venture or partnership and the joint venture or partnership <br />submit Proposals for the same project (in such an instance, both Bids may be <br />rejected); or <br />e. If Bid Form entries are not made in ink. <br />1-02.14 Disqualification of Bidders <br />A Bidder will be deemed not responsible if the Bidder does not meet the mandatory bidder <br />responsibility criteria in RCW 39.04.350(1), as amended, and noted in 1-02.1(1). <br />The City will verify that the Bidder meets the mandatory bidder responsibility criteria in RCW <br />39.04.350(1). To assess bidder responsibility, the City reserves the right to request <br />documentation as needed from the Bidder and third parties concerning the Bidder's compliance <br />with the mandatory bidder responsibility criteria. <br />If the City determines the Bidder does not meet the mandatory bidder responsibility criteria in <br />RCW 39.04.350(1) and is therefore not a responsible Bidder, the City shall notify the Bidder in <br />writing, with the reasons for its determination. If the Bidder disagrees with this determination, it <br />may appeal the determination within two business days of the City's determination by presenting <br />its appeal and any additional information to the City. The City will consider the appeal and any <br />additional information before issuing its final determination. If the final determination affirms that <br />the Bidder is not responsible, the City will not execute a contract with any other Bidder until at <br />least two business days after the Bidder determined to be not responsible has received the City's <br />final determination. <br />If the Contract Documents contain supplemental responsibility criteria, then a Bidder will be <br />deemed not responsible if the Bidder does not meet those criteria, all as set forth in SECTION <br />00 22 13, SUPPLEMENTAL INSTRUCTIONS TO BIDDERS. <br />1-02.15 Pre -Award Information <br />Before awarding any contract, the City may require one or more of these items or actions of the <br />apparent lowest responsible Bidder: <br />1. A complete statement of the origin, composition, and manufacture of any or all <br />materials to be used, <br />2. Samples of these materials for quality and fitness tests, <br />3. A progress schedule, in a form the City requires, showing the order of and time <br />required for the various phases of the Work, <br />4. A breakdown of costs assigned to any bid item, <br />5. Attendance at a conference with the Engineer or representatives of the Engineer, <br />6. Obtain and furnish a copy of a business license to do business in the City of <br />Everett. <br />7. A copy of State of Washington Contractor's Registration, or <br />8. Any other information or action taken that is deemed necessary to ensure that the <br />Bidder is the lowest responsible bidder. <br />After Bid opening, but prior to award, the apparent successful Bidder shall, if requested by the <br />City, attend a pre -award conference to respond to questions by the City regarding evaluation of <br />Bids. The City will emphasize items such as insurance and bonding that will assist in prompt <br />issuance of the Notice to Proceed. By conducting a pre -award conference, the City has not <br />thereby waived its right to make determinations regarding responsiveness and responsibility of <br />the Bidder. <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 21 13 <br />INSTRUCTIONS TO BIDDERS March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.