My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2024 6:26:35 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
01 35 73 <br />01 73 20 <br />01 74 00 <br />01 75 16 <br />01 78 23 <br />DIVISION 02 <br />02 30 00 <br />02 41 00 <br />DIVISION 09 <br />09 90 00 <br />DIVISION 10 <br />10 14 00 <br />DIVISION 11 <br />11 95 00 <br />DIVISION 31 <br />31 05 13 <br />31 05 14 <br />31 09 00 <br />31 1000 <br />31 23 19 <br />31 23 24 <br />31 63 26 <br />DIVISION 32 <br />32 12 16 <br />32 31 13 <br />DIVISION 33 <br />33 05 13 <br />33 05 17 <br />33 05 31 <br />3311 10 <br />33 11 10.36 <br />33 11 10.47 <br />33 11 50 <br />33 12 16 <br />33 13 00 <br />33 32 16.13 <br />33 41 10 <br />DIVISION 40 <br />40 05 13 <br />40 05 23 <br />40 05 23.15 <br />40 05 23.18 <br />40 05 23.72 <br />DELEGATED DESIGN PROCEDURES <br />OPENINGS AND PENETRATIONS IN CONSTRUCTION <br />FINAL CLEANING <br />TESTING, TRAINING AND SYSTEM START-UP <br />OPERATION AND MAINTENANCE DATA <br />EXISTING CONDITIONS <br />SUBSURFACE INVESTIGATION <br />DEMOLITION <br />FINISHES <br />PAINTING AND COATING <br />SPECIALTIES <br />IDENTIFICATION DEVICES <br />EQUIPMENT <br />STORAGE TANK HYDRODYNAMIC MIXING SYSTEM <br />EARTHWORK <br />EARTHWORK <br />ZONE A EARTHWORK <br />INSTRUMENTATION AND MONITORING <br />SITE CLEARING <br />DEWATERING <br />CONTROLLED DENSITY FLOWABLE FILL <br />CONTRACTOR DESIGNED EXCAVATION SUPPORT <br />EXTERIOR IMPROVEMENTS <br />FLEXIBLE PAVEMENT <br />CHAIN LINK FENCING AND GATES <br />UTILITIES <br />MANHOLES <br />PRECAST VAULTS <br />PVC SOLID WALL PIPE <br />DUCTILE IRON WATER DISTRIBUTION SYSTEMS <br />STEEL PIPE LINED AND COATED <br />STEEL PIPE FABRICATED SPECIALS <br />EXISTING PIPE ABANDONMENT AND PROTECTION <br />WATER DISTRIBUTION VALVES AND APPURTENANCES <br />TESTING AND DISINFECTING OF WATER PIPING AND RESERVOIR <br />SUMP PUMPING SYSTEM <br />STORM UTILITY DRAINAGE PIPING <br />PROCESS INTEGRATION <br />COMMON WORK RESULTS FOR PROCESS PIPING <br />STAINLESS STEEL PROCESS PIPE AND TUBING <br />GATE VALVES <br />BUTTERFLY VALVES <br />MISCELLANEOUS VALVES <br />
The URL can be used to link to this page
Your browser does not support the video tag.