Laserfiche WebLink
40 05 51 <br />40 71 13 <br />40 75 00 <br />40 75 10 <br />COMMON WORK RESULTS FOR PROCESS VALVES <br />MAGNETIC FLOW METER <br />PROCESS LIQUID ANALYTICAL MEASUREMENT <br />DECHLORINATION SYSTEM <br />CERTIFICATE OF ENGINEER <br />The following Technical Specifications have been prepared under the direction of the <br />Registered Professional Engineer indicated below: <br />Travis McFeron, PE, SE <br />PSE Engineers <br />DIVISION 03 <br />03 15 10 <br />03 15 12 <br />03 15 19 <br />03 15 20 <br />03 21 00 <br />03 30 10 <br />03 30 20 <br />03 31 00 <br />03 60 00 <br />03 64 00 <br />03 64 23.10 <br />DIVISION 05 <br />05 50 00 <br />DIVISION 33 <br />33 16 10 <br />33 16 10.10 <br />CONCRETE <br />EXPANSION AND CONSTRUCTION JOINTS <br />TANK WALL BASE AND TOP JOINT <br />ANCHORAGE TO CONCRETE <br />EARTHQUAKE CABLES <br />REINFORCING STEEL <br />COLD WEATHER CONCRETING PROCEDURES <br />HOT WEATHER CONCRETING PROCEDURES <br />STRUCTURAL CONCRETE <br />GROUTING <br />INJECTABLE HOSE INSTALLATION PROCEDURE <br />EPDXY ADHESIVE INJECTION OF CONCRETE (PRESTRESS TANKS) <br />— METALS <br />METAL FABRICATIONS <br />UTILITIES <br />PRESTRESSED CONCRETE WATER UTILITY STORAGE RESERVOIR <br />PRESTRESSED CONCRETE WATER UTILITY STORAGE RESERVOIR <br />ACCESSORIES <br />