My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 11:19:41 AM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SECTION 00 72 00 <br />GENERAL CONDITIONS <br />CONTENTS <br />1. GENERAL INFORMATION 1 <br />1.1 Definitions of Words and Terms 1 <br />1.2. Contract Documents 5 <br />2. SPECIFICATIONS AND DRAWINGS 6 <br />2.1. Interpretation of Specifications and Drawings 6 <br />2.2. Division of Specifications and Drawings 6 <br />2.3. Discrepancies in Specifications and Drawings 6 <br />2.3.1. Errors and Omissions 6 <br />2.3.2. Conflicting Provisions 7 <br />2.3.3. Utilities 7 <br />2.3.3.1 General 7 <br />2.3.3.2 Known Utilities 7 <br />2.3.3.3 Service Connections 8 <br />2.3.3.4 Unknown Utilities 8 <br />2.4. Submittals 8 <br />2.5. Contractor's Copies of Contract Documents 8 <br />3. OWNER 8 <br />3.1. General 8 <br />3.2. Owner's Representative 9 <br />4. CONTRACTOR 10 <br />4.1. Contractor's Representative 10 <br />4.2. Construction Procedures 11 <br />4.3. Subcontractors 11 <br />4.4. Responsibilities 12 <br />4.4.1. Subcontractors, Manufacturers and Suppliers 12 <br />4.4.2. Contractor's Employees 12 <br />4.4.3. Payment for Labor and Materials 12 <br />4.4.4. Attention to Work 12 <br />4.4.5. Safety 12 <br />4.4.6. Threats, Intimidation and Harassment Forbidden 13 <br />4.4.7. Weapons Forbidden 13 <br />4.4.8. Safety Standards 13 <br />4.4.9. Public Safety and Convenience 13 <br />4.4.10. Access to Work 13 <br />4.4.11. Emergencies 14 <br />4.4.12. Trench Excavation 14 <br />4.5. Owner -Contractor Coordination 14 <br />4.5.1. Service of Notice 14 <br />4.5.2. Suggestions to Contractor 14 <br />4.5.3 Meetings with Owner 15 <br />4.5.4. Cooperation with Others 15 <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 72 00 <br />GENERAL CONDITIONS March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.