Laserfiche WebLink
5. PROGRESS AND COMPLETION 15 <br />5.1. Notice to Proceed 15 <br />5.2. Contract Time 16 <br />5.2.1. General 16 <br />5.2.2. Construction Schedule 16 <br />5.2.2.1 General 16 <br />5.2.2.2 Extensions of Contract Time 17 <br />5.2.3. Construction Progress 17 <br />5.2.4. Delays 18 <br />5.2.4.1 General 18 <br />5.2.4.2 Bonuses 18 <br />5.3. Suspension Procedures 18 <br />5.4. Termination Procedures 18 <br />5.4.1. Termination by Owner for Default 18 <br />5.4.2. Termination for Convenience 20 <br />5.4.3. Termination by Contractor after Suspension 20 <br />5.4.4. Contractor Obligations upon Termination 20 <br />5.4.5. Ownership of Materials upon Termination 20 <br />5.4.6. Opportunity to Cure 20 <br />5.4.7 Waiver of Remedies for Any Breach 21 <br />5.5. Possession and Use of Completed Portions of the Work 21 <br />5.6. Possession of Incomplete Portions of the Project 21 <br />5.7. Substantial Completion 21 <br />5.8. Acceptance of Work 22 <br />6. CHANGES 22 <br />6.1 Owner's Right to Direct Changes to the Work 22 <br />6.2 Extra Work 22 <br />6.3 Change Orders 22 <br />6.4 Value Engineering and Cost Sharing 23 <br />7. LABOR STANDARDS 23 <br />7.1. Wages of Employees 23 <br />7.1.1. General 23 <br />7.1.2. Contractor's Responsibility 24 <br />7.1.3. Federal Labor Requirements 24 <br />7.2. Payment Certificates 24 <br />7.3. Hours of Labor 25 <br />7.4. Contract Work Hours 25 <br />7.5. Overtime Work 25 <br />7.6 Labor Relations 25 <br />8. MATERIAL, EQUIPMENT, WORKMANSHIP AND CONSTRUCTION UTILITIES 26 <br />8.1. General 26 <br />8.2. Product Data 26 <br />8.3. Quality 27 <br />8.4. Material and Equipment Specified by Name 27 <br />8.5. Requests for Substitution 27 <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 72 00 <br />GENERAL CONDITIONS March 2024 <br />