My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 11:19:41 AM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
15.3 Insurance 49 <br />15.3.1 General 49 <br />15.3.2 Insurer Rating 50 <br />15.3.3 Claims Made Form Requirements 50 <br />15.3.4 Cross Liability Endorsement 50 <br />15.3.5 Additional Insured 50 <br />15.3.6 Contractor Insurance Primary 50 <br />15.3.7 Assumption of Risk 50 <br />15.3.8 Cost Included in Price 50 <br />15.3.9 Subcontractors 50 <br />15.3.10 No Work Until Insurance Requirements Met 51 <br />15.3.11 Failure to Procure and Maintain Insurance 51 <br />15.3.12 Cancellation 51 <br />15.3.13 Evidence of Insurance 51 <br />15.3.14 Coverages and Limits 52 <br />15.3.14.1 CGL 52 <br />15.3.14.2 Builders' Risk 52 <br />15.3.14.3 Other Coverages 53 <br />15.3.14.4 Limits 53 <br />15.3.14.5 Automobile 53 <br />15.3.14.6 Excess or Umbrella Liability 53 <br />15.3.14.7 Pollution Liability 53 <br />15.3.14.8 Worker's Compensation 53 <br />15.3.15 Self -Insurance 54 <br />16. LAWS, REGULATIONS AND PERMITS 54 <br />16.1 General 54 <br />16.2 Permits and Licenses 54 <br />16.3 Patents and Royalties 54 <br />17. AUDITS 55 <br />17.1 General 55 <br />17.2 Claims 55 <br />17.3 Required Documentation for Audits 55 <br />18. MISCELLANEOUS 56 <br />18.1 Construction 56 <br />18.2 Applicable Law and Choice of Forum 56 <br />18.3 Severability 57 <br />18.4 Headings for Convenience 57 <br />18.5 Waiver 57 <br />18.6 City of Everett Business License 57 <br />18.7 Compliance with Federal, State and Local Laws 57 <br />18.8 Complete Agreement 58 <br />18.9 Successors Bound 58 <br />18.10 Effective Date 58 <br />18.11 Contractor Registration 58 <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 72 00 <br />GENERAL CONDITIONS March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.