My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 11:19:41 AM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
10.2 Form of Notice 41 <br />10.3 Supplemental Information 42 <br />11. DIFFERING SITE CONDITIONS 42 <br />12. CONTRACT CLAIMS 43 <br />12.1 General 43 <br />12.2 Contents 43 <br />12.3 FALSE OR OMITTED INFORMATION 45 <br />12.4 Remedies 45 <br />12.4.1 General 45 <br />12.4.2 Extra Work 45 <br />12.4.2.1 Adjustment of Contract Sum 45 <br />12.4.2.2 Extension of Contract Time 45 <br />12.4.3 Delays 45 <br />12.4.3. Owner Caused Delay Unrelated to Extra Work 45 <br />12.4.3.1.1 Adjustment of Contract Sum 45 <br />12.4.3.1.2 Adjustment of Contract Time 46 <br />12.4.3.2 Contractor Caused Delay 46 <br />12.4.3.3 Delays Concurrently Caused by Contractor and Owner 46 <br />12.4.3.3.1 Adjustment of Contract Sum 46 <br />12.4.3.3.2 Adjustment of Contract Time 46 <br />12.4.3.4 Third Party Caused Delays and Force Majeure 46 <br />12.4.3.4.1 Caused Solely by Third Parties or Force Majeure 46 <br />12.4.3.4.1.1 Adjustment of Contract Sum Error! Bookmark not defined. <br />12.4.3.4.1.2 Adjustment of Contract Time Error! Bookmark not defined. <br />12.4.3.4.2 Caused Concurrently by Third Parties and Contractor or Owner Error! Bookmark not defined. <br />12.4.3.4.2.1 Adjustment of Contract Sum Error! Bookmark not defined. <br />12.4.3.4.2.2 Adjustment of Contract Time Error! Bookmark not defined. <br />12.4.3.5 Extended or Unabsorbed Overhead 47 <br />12.4.3.5.1 General 47 <br />12.4.3.5.2 Elements 47 <br />12.4.3.5.2.1 Resources 47 <br />12.4.3.5.2.2 No Material Variations 47 <br />12.4.3.5.2.3 Overabsorbed Overhead 48 <br />12.4.4 Inefficiencies 48 <br />12.4.4.1 Adjustment of Contract Sum 48 <br />12.4.4.2 Adjustment of Contract Time 48 <br />13. DISPUTES 48 <br />13.1 Resolution 48 <br />13.2 Continuing the Work 48 <br />14. TIME LIMITATIONS AND JURISDICTION 48 <br />15. LIABILITY AND INSURANCE 49 <br />15.1 General 49 <br />15.2 Bonds 49 <br />15.2.1 Payment and Performance Bonds 49 <br />15.2.2 Maintenance Bond 49 <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 72 00 <br />GENERAL CONDITIONS March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.