Laserfiche WebLink
FINAL SOW 4/30/2024 1 <br /> <br />Walter E Hall Community Connections Pathway <br />City of Everett <br />Scope of Work <br />April 30, 2024 <br /> <br />Walter E Hall Community Connections Pathway <br />The goal of the project is to improve non-vehicular access to Walter E Hall Park by constructing a 6’-8’ <br />wide multi-use path connection between 90th street SW. The scope of work includes preparing design, <br />engineering, including survey and geotechnical investigation, permitting, and construction documents <br />for approximately 1800 linear feet of asphalt path. <br />Task 1 Project Administration <br />Purpose: Maintain clear communication with the city and design team to keep project on schedule and <br />within budget. <br />Deliverables: <br />· Kickoff and Project set-up <br />· Project Schedule with monthly updates <br />· Monthly invoices <br />· Meeting agendas and minutes <br /> <br />Task 2 Base Data <br />Purpose: Collect basic site data including existing documentation, conduct a topographical survey and <br />geotechnical investigation. <br /> <br />Task 2.1 Survey <br />A) Property boundary survey of parcels <br />B) Topographic survey of area shown in attachment A – Limit of Work. 2-foot contours, existing <br />overhead and underground utilities, and portion of 90th St SW roadway <br />C) Tree Survey <br />Task 2.2 Geotechnical Investigation <br />A) Site Reconnaissance <br />(a) Review existing reports and data in the project vicinity <br />(b) Site observations of any ground features <br />B) Subsurface Explorations <br />(a) Dynamic Cone Penetrometer Testing (DCPT) - Conduct 5-6 DCPT along the length of <br />the potential trail alignment <br />