My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board and Vellum LLC 6/11/2024
>
Contracts
>
6 Years Then Destroy
>
2025
>
Board and Vellum LLC 6/11/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2024 1:54:31 PM
Creation date
6/13/2024 1:52:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Board and Vellum LLC
Approval Date
6/11/2024
Council Approval Date
6/5/2024
End Date
12/31/2025
Department
Parks
Department Project Manager
Katherine Phillips
Subject / Project Title
Walter E Hall Community Connections Design Services
Tracking Number
0004393
Total Compensation
$89,496.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Dates <br />Project Team <br />Project Address <br /> <br />Project Services <br />2021 <br />DCW Cost Management <br />9415 N Geneva Avenue <br />Portland, OR 97203 <br />Cost Estimation <br />Northgate Park Accessibility Improvements <br />The intent of this project is to remediate all the <br />barriers noted on the ADA Transition Plan Site Map for <br />Northgate Park. In general, the project design includes <br />but is not limited to: remove and replace most of the <br />existing pathways, construct new accessible spectator <br />and player seating areas at the ballfields, construct <br />new pathways to some of the picnic areas and <br />replace some of the picnic tables and pads, replace <br />two curb ramps, and fixing the accessible parking <br />space in the parking lot, and replace concrete pads <br />around benches and/or trash cans so that they meet <br />accessibility requirements. <br />Client <br />Reference <br /> <br />Telephone <br />Email <br />Contract Value <br />Portland Parks & Recreation <br />Taj Hanson, Project Manager <br />Walker Macy <br />503 425 1128 <br />thanson@walkermacy.com <br />$325K (Initial Budget) <br />Dates <br />Project Team <br />Project Address <br /> <br />Project Services <br />2020 - 2024 <br />PanGEO, Inc. <br />6320 Grandview Drive West <br />University Place, WA 98467 <br />Geotechnical Investigation <br />Chambers Creek Park <br />PanGEO prepared the geotechnical report and <br />geologic hazards assessment for the construction of <br />new trails, boardwalks and two pedestrian bridges <br />at this 900-acre park. Our service scope included <br />providing a slope stability reconnaissance of the park <br />slopes and existing trails to assist with determining <br />potential trail alignments and routes in areas that are <br />more stable. We also prepared recommendations to <br />stabilize marginally stable slopes in the immediate area <br />of the pedestrian bridge abutments using micropiles. <br />Client <br />Reference <br /> <br />Telephone <br />Email <br />Contract Value <br />Pierce County <br />Roger Kuydendal <br />Gray & Osborne <br />360 454 5490 <br />rkuykendall@g-o.com <br />$47,419 <br />16 <br />Statement of Qualifications <br />3. Performance
The URL can be used to link to this page
Your browser does not support the video tag.