Laserfiche WebLink
(1) 10 AWG THHN/THWN-2,CU.,BLACK(Ll) 10.9 A AC (1) 10 AWG THHN/THWN-2,CU_BLACK(Ll) MAX 10-9 A A (1) 10 AWG THHN/THWN-2,CU_,BLACK(L1) MAX 10-9 A A 1) 12-2 TC-ER,THHN/THWN-2,Cu. MAX 10.9 A AC <br /> 15 (1) 10 AWG THHN/THWN-2,CU.,RED(1-2) 240 V AC 3 (1) 10 AWGTHHN/THWN-2,CU-,RED IL 2) 240 V A 2 (1) 10 AWGTHHN/THWN-2,CU-,RED(1.2) 240 V A 1 1) 6 AWG BARE.CU(EGC) 240 V AC <br /> (1) 10 AWG THHN/THWN-2,CU_WHITE(N) (1) 10 AWG THHN/THWN-2.CU.,GREEN(EGC) (1) 10 AWG THHN/THWN-2,CU-,GREEN(EGC) <br /> (1) 10 AWG THHN/THWN-2,CU.,GREEN(EGC) OR SO-2 OF-B W/G,THHN/THWN-2,SOLID CU. OR 10-2 OF-B W/G(OR NM-8).THHN/THWN-2,SOLID CU. <br /> 1 3/4 INCH EMT EXTERIOR (1) 3/4 INCH EMT EXTERIOR 1 314 INCH EMT Not Required for OF-B or NWB Cable INTERIOR EXTERIOR BLUE RAVEN <br /> 1403 N. Research Way <br /> Orem, UT 84097 <br /> 800.377.4480 <br /> W W W.BLUERAVENSOLAR.COM <br /> DESIGNER NOTES: ELECTRICAL NOTES: CONFIDENTIAL-THE INFORMATION <br /> HEREIN CONTAINED SHALL NOT BE <br /> LOAD SIDE BREAKER IN MSP.INTERIOR POI ALL INTERIOR CONDUIT MUST BE SCH 80 PVC. USED FOR THE BENEFIT OF ANYONE <br /> EXCEPT BLUE RAVEN SOLAR NOR <br /> SHALL IT BE DISCLOSED IN WHOLE OR <br /> IN PART TO OTHERS OUTSIDE <br /> RECIPIENTS ORGANIZATION,EXCEPT <br /> ENPHASE IQ COMBINER 4 IN CONNECTION WITH THE SALE AND <br /> (E)200A MAIN SERVICE PANEL X-IQ-AM1-240-4 USE OF THE RESPECTIVE EQUIPMENT, <br /> (E)200A/2P MAIN BREAKER (SOLAR LOAD ONLY) <br /> WITHOUT THE WRITTEN PERMISSION <br /> OF BLUE RAVEN SOLAR LLC. <br /> PV AC DISCONNECT <br /> (E)200A/2P NON-FUSED <br /> L1 LOCKABLE,VISIBLE OPEN (9) SIL-410 HC+ <br /> L2 30A,240V,2-POLE UL 1703 COMPLIANT NABCEP <br /> N <br /> (E)LOADSPV BREAKER TO BE LOCATED ENVOY (9) EnphaselQ8PL1 PHASE,UL 1741 OMPLANT2-US CERTIFIED <br /> 10— AT OPPOSITE END OF BUSSING15A/2P <br /> FROM MAIN BREAKER 4"x4"x4"PVC JB-1 EZ SOLAR <br /> N JUNCTION BOX JUNCTION BOX PV INSTALLATION <br /> (N)20A/2P <br /> L, L, (N)20A/2P­T10—L JB ��, JB-1 �, _ _ (1) CIRCUIT OF PROFESSIONAL <br /> N L2 <br /> N N L2 $COtI GUfrIOy <br /> Eco Ecc r_-- Eco —Eco I[---Eco _ _ 9 MODULES #PV-011719-015866 <br /> --------------------------------------- <br /> G CONTRACTOR: <br /> 120/240 VAC N _—J 3 2 1 <br /> 60HZ I 1s 15 BRS FIELD OPS <br /> 1 PHASE I JUNCTION BOX <br /> FF <br /> TO UTILITY I <br /> OPTIONAL IF OF-B 800-377-4480 <br /> GRID I CABLE USED FOR <br /> G J ENTIRE HOMERUN <br /> Z <br /> G H O r 0+ Z O <br /> (E)GROUNDING �O 0� %A sy l7O, <br /> ELECTRODE(S) n U C] <br /> L_ 00 Cfl <br /> Cft m (3) N M <br /> 0) C Lli <br /> `1W <br /> Z o 0) N N <br /> 'O �FC1 R �� i. Fnto <br /> Ffs�o�A L ti�G` Cn <br /> Ncn <br /> Digitally signed by I a 21dV 3l1' i rL i �' ~ Cu Cfl U) Cl) <br /> J o u n g h JounghoChoi Snohomish PUD 1A 1.aKn o.i _ C) 0)DateV <br /> 09:49 0424.02.02 oo Ifs j - ` V M w a Q <br /> 09:49:04-05'00' eOwJi <br /> oChoi Adobe Acrobat version: wr ��+ <br /> 2023.008.2042157� �r � _ DRAWING BY: <br /> 72 209 663 Brendan Fillmore <br /> 16%1 PLOT DATE: <br /> .m <br /> February 1 , 2024 <br /> INTERCONNECTION NOTES <br /> PROJECT NUMBER: <br /> 705.12(8)(3)THE FOLLOWING METHOD(S) SHALL BE USED TO 908916 <br /> DETERMINE THE RATINGS OF BUSBARS: (2)WHERE TWO SOURCES, <br /> ONE A PRIMARY POWER SOURCE AND THE OTHER ANOTHER POWER SHEET NAME: <br /> SOURCE,ARE LOCATED AT OPPOSITE ENDS OF A BUSBAR THAT <br /> CONTAINS LOADS, THE SUM OF 125 PERCENT OF THE ELECTRICAL <br /> POWER-SOURCE(S) OUTPUT CIRCUIT CURRENT AND THE RATING OF I <br /> THE OVERCURRENT DEVICE PROTECTING THE BUS BAR SHALL NOT REVISION: PAGE NUMBER: <br /> EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR. UTILITY COMPANY: Snohomish County Public Utilities District (PUD) PERMIT ISSUER: City of Everett 0 PV5 <br />