Laserfiche WebLink
ASBESTOS LABORATORY SERVICES <br /> NVL <br /> Company Terracon -Mountlake Terrace NVL Batch Number 2309392.00 <br /> Address 21905 64th Ave. W#100 TAT 5 Days AH No <br /> Mountlake Terrace, WA 98043 Rush TAT <br /> Project Manager Mr. Daniel Sheppard Due Date 6/21/2023 Time 8:00 AM <br /> Phone (425)771-3304 Email daniel.sheppard@terracon.com <br /> Cell (425)273-6046 Fax (425)771-3549 <br /> Project Name/Number:81227459 Project Location: POE Equator Shed <br /> Subcategory PLM Bulk <br /> Item Code ASB-02 EPA 600/R-93-116 Asbestos by PLM <bulk> <br /> Total Number of Samples_-12—_ Rush Samples <br /> Lab ID Sample ID Description A/R <br /> 1 23057205 1-01 A <br /> 2 23057206 1-02 A <br /> 3 23057207 1-03 A <br /> 4 23057208 2-01 A <br /> 5 123057209 2-02 _ _ A <br /> 6 23057210 2-03 _ _ _ _ A <br /> 7 23057211 3-01 A <br /> 8 23057212 3-02 A <br /> 9 23057213 3-03 A <br /> 10 23057214 4-01 _ A <br /> 11 23057215 4-02 A <br /> 12 23057216 4-03 A <br /> Print Name Signature Company Date Time <br /> Sampled by Client �II <br /> Relinquished by Drop Box k <br /> Office Use Only Print Name Signature Company Date Time <br /> Received by Hilary Crumley NVL 6/14/23 800 <br /> Analyzed by Hilary Crumley NVL 6/19/23 <br /> Results Called by <br /> ,❑Faxed ❑Emailed <br /> Special <br /> Instructions: <br /> Date: 6/14/2023 <br /> Time 7=9 API <br /> Enterea Gy Rachelle Miller <br /> page 6 of 7 <br />