Laserfiche WebLink
PERMITS ENVIRONMENTAL COMPLIANCE SITE ACQUISITION FIBER PROVIDER VERIZON GENERAL CONTRACTOR <br /> BUILDING PERMIT: ENVIRONMENTAL COMPLIANCE CONSENTS REQUIRED VZB TO INSTALL FIBER FROM MEET POINT TO MEET POINT:VZW GC TO USE(E)VZW HH AS <br /> COMPLETE (N)LTX FDP IN TELCO CABINET.(APPROX 160') MEET POINT. THERE IS AN (E)2"PVC BRIDGE <br /> NO BP IS REQUIRED FOR THIS SCOPE <br /> VERIZON BETWEEN VZW HH AND(E)MCI HH. <br /> Actualize <br /> OF WORK RE SPECIALIST VZW GC TO SUPPLY AND INSTALL(1)(N)4" we lMGlke it �a eve <br /> DON MURRAY SCH 40 PVC CONDUIT FROM MEET POINT TO PP <br /> ROW PERMITS ARE THE DONALD.MURRAY20)VERIZONWIRELESS.COM <br /> RESPONSIBILITY OF THE INCOMING VZW TELCO CABINET.TIE(N)CONDUIT INTO <br /> SERVICE PROVIDER TRANSPORT ENGINEER (E)VZW HH.CONDUIT TO CONTAIN(3)(N) 1.25" ■ <br /> ROBERT WELTER INNERDUCTS WITH PULL TAPE,ONE TO BE <br /> VZW GC TO OBTAIN LNI ELECTRICAL ROBERT.WELTER(a)VERIZONWIRELESS.COM CLEARLY LABELED FOR VZB USE. verizonJ <br /> PERMITS AS REQUIRED (APPROX.160') <br /> CONSTRUCTION ENGINEER <br /> PAUL SCHMITZ VZW GC TO CUT 4"POINT OF ENTRY INTO GLENWOOD <br /> PUBLIC WORKS PERMIT REQUIRED. PAUL.SCHMITZ(c)VERIZONWIRELESS.COM BASE OF TELCO CABINET. <br /> FINAL INSPECTION NEEDED ONCE 5818 GLENWOOD AVE, <br /> CONSTRUCTION IS COMPLETE ONEFIBER <br /> BRAD LANDIS VZW GC TO INSTALL(1)(N)LTX-C721L-S FDP IN EVERETT, WA 98203 <br /> BRAD.LAN DISCcDVERIZON.COM TELCO CABINET. ONEFIBER-CONVERSION FIBER <br /> 425-229-3123 UCR <br /> VZW TO UTILIZE(E)SPARE SMF JUMPER <br /> LANDLORD FROM(N)FDP IN TELCO CABINET TO 7250-IXR- MDG LOCATION <br /> LANDLORD: e ROUTER IN RF CABINET. 5000085732 <br /> SNOHOMISH PUD ID: <br /> PROJECT#: 15670063 <br /> NTP IS REQUIRED FOR THIS SCOPE OF WORK. <br /> PLEASE CONTACT ACTUALIZE WHEN DATES AND FUZE ID: 464516 <br /> GC DETAILS ARE ASSIGNED. <br /> COMPLIANCE EASEMENTS ACRONYM LEGEND LEGEND <br /> ALL WORK AND MATERIALS SHALL NO ADDITIONAL EASEMENTS ARE REQUIRED (VZW)VERIZON WIRELESS CONDUIT <br /> BE PERFORMED AND INSTALLED FOR THIS SCOPE OF WORK (ISP) INCOMING SERVICE PROVIDER <br /> IN ACCORDANCE WITH THE (IFP) INCOMING FIBER PROVIDER HAND HOLE(HH)OR <br /> CURRENT CONDITIONS OF THE APPLICABLE (SOW)SCOPE OF WORK PEDESTAL(PED) <br /> CODES AS ADOPTED BY THE LOCAL (GC)GENERAL CONTRACTOR <br /> GOVERNING AUTHORITIES. (P) PROPOSED POINT OF ENTRY(POE) <br /> NOTHING IN THESE PLANS IS TO (N) NEW <br /> BE CONSTRUED TO PERMIT WORK (E) EXISTING POWER LEADS ■■■ <br /> NOT CONFORMING TO THESE CODES. (MP) MEET POINT <br /> (HH)HAND HOLE INNERDUCT ■■■■■■■■■■■■■■■■■ <br /> (UG)UNDERGROUND <br /> (OH)OVERHEAD FIBER JUMPER <br /> (NID)NETWORK INTERFACE DEVICE <br /> (FDU)FIBER DISTRIBUTION UNIT (N) IFP EQUIPMENT C <br /> (FDP) FIBER DISTRIBUTION PANEL <br /> (PDU)POWER DISTRIBUTION UNIT PDU <br /> (COP)CLOSE OUT PACKAGE <br /> (COR)CHANGE ORDER REQUEST (N)-48V FUSE PANEL <br /> (POE) POINT OF ENTRY <br /> (PED)PEDESTAL <br /> (FAE) FIELD ASSURANCE ENGINEER <br /> SHEET No. <br /> SCALE: NTS (11X17) DO NOT SCALE DRAWINGS.CONTRACTOR MUST VERIFY ALL DRAWINGS AND ADVISE CONSULTANTS OF ANY ERRORS OR OMISSIONS. NO VARIATIONS OR MODIFICATIONS TO <br /> WORK SHOWN SHALL BE IMPLEMENTED WITHOUT PRIOR WRITTEN APPROVAL.ALL PREVIOUS ISSUES OF THIS DRAWINGS ARE SUPERSEDED BY THE LATEST REVISION 2 <br />