Laserfiche WebLink
SCOPE OF WORK NOTES <br /> MEET POINT:VZW GC TO USE(E)VZW HH <br /> AS MEET POINT. THERE IS AN (E)2"PVC <br /> BRIDGE TO(E)MCI HH. <br /> � � �� <br /> VZW GC TO SUPPLY AND INSTALL(1)(N)4" Actualize <br /> 4 we make It �0vvm <br /> SCH 40 PVC CONDUIT FROM MEET POINT TO <br /> VZW TELCO CABINET.TIE(N)CONDUIT INTO (E)TELCO <br /> (E)VZW HH.CONDUIT TO CONTAIN(3)(N) CABINET verizonJ <br /> 1.25"INNERDUCTS WITH PULL TAPE, ONE TO ��� <br /> BE CLEARLY LABELED FOR VZB USE. <br /> (APPROX. 160') <br /> - GLENWOOD <br /> VZW GC TO CUT 4"POINT OF ENTRY INTO A4 <br /> BASE OF TELCO CABINET. -------- i 5818 GLENWOOD AVE, <br /> EVERETT, WA 98203 <br /> VZW GC TO INSTALL(1)(N)LTX-C721L-S FDP vj _ <br /> IN TELCO CABINET ONEFIBER-CONVERSION FIBER <br /> UCR <br /> VZB TO INSTALL FIBER FROM MEET POINT <br /> TO(N)LTX FDP IN TELCO CABINET. MDG SITE LOCATION ID: 5000085732 <br /> (APPROX 160') _ _ <br /> PROJECT#: 15670063 <br /> VZW TO UTILIZE(E)SPARE SMF JUMPER , <br /> FROM(N)FDP IN TELCO CABINET TO 7250- FUZE ID: 464516 <br /> IXR-e ROUTER IN RF CABINET. - ti <br /> MEET POINT: <br /> (E)VZW HH WITH (E) <br /> VZW GC TO SUPPLY AND INSTALL(1)(N)4"SCH 40 BRIDGE TO MCI HH <br /> PVC CONDUIT FROM MEET POINT TO VZW TELCO <br /> CABINET.TIE(N)CONDUIT INTO(E)VZW HH.CONDUIT <br /> TO CONTAIN(3)(N) 1.25"INNERDUCTS WITH PULL <br /> TAPE, ONE TO BE CLEARLY LABELED FOR VZB USE. - <br /> APPROX.160' <br /> L <br /> L <br /> SHEET No. <br /> SCALE: NTS (11X17) DO NOT SCALE DRAWINGS.CONTRACTOR MUST VERIFY ALL DRAWINGS AND ADVISE CONSULTANTS OF ANY ERRORS OR OMISSIONS. NO VARIATIONS OR MODIFICATIONS TO <br /> WORK SHOWN SHALL BE IMPLEMENTED WITHOUT PRIOR WRITTEN APPROVAL.ALL PREVIOUS ISSUES OF THIS DRAWINGS ARE SUPERSEDED BY THE LATEST REVISION 3 <br />