My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/06/26 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/06/26 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 4:48:59 PM
Creation date
6/27/2024 9:00:45 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Public Works 425.257.8800 everettwa.gov/publicworks Page 9 of 10 <br />H.KING COUNTY will coordinate all its activities with the City's Operations <br />Superintendent or other City Staff as designated by the City's Operation <br />Superintendent or use of the Biosolids Pad. The City will make all reasonable efforts <br />to minimize interference from other construction activities. <br />I.Prior to delivering any biosolids to the Biosolids Pad, KING COUNTY must obtain <br />written approval of this License Agreement from the Department of Ecology <br />Biosolids Coordinator for the Northwest Region. KING COUNTY will deliver a copy of <br />such written approval to the City's Operations Superintendent prior to delivering any <br />biosolids to the Biosolids Pad. <br />J.In the event nuisance odors are generated, which determination will be made at the <br />City's sole discretion, KING COUNTY shall cap the stockpiled biosolids with a 2–3-inch <br />layer of material (i.e., sawdust or sand) capable of minimizing nuisance odors. The <br />cap material so used will then be deemed part of the biosolids that must be hauled <br />off-site by KING COUNTY. If the City determines in its sole discretion that the cap is <br />insufficient to minimize odors, KING COUNTY shall haul offsite the biosolids causing <br />the odors within 10 days after receiving notice from the City. <br />K.Within 30 days of the expiration or termination of this License Agreement, the City's <br />Biosolids Program Manager or designee will confirm by a visual inspection that KING <br />COUNTY has substantially removed all materials (including biosolids) KING COUNTY <br />deposited on City Property under this License Agreement and that cleanup is <br />satisfactory, i.e., the pad surface has been restored to its original condition. The City <br />(Operations Superintendent or designee) will notify KING COUNTY in writing of the <br />results of this inspection. If further action is necessary, the City will notify KING <br />COUNTY of the time frame for further removal and clean up. If KING COUNTY fails to <br />take further action within the timeframe specified or provide adequate cause as to <br />why such further action cannot be accomplished within the timeframe specified, the <br />City will take the necessary action to restore the site to its original condition through <br />any means the City deems necessary. All costs associated with these activities will be <br />paid by KING COUNTY. <br />L.KING COUNTY is responsible for any damage to any City equipment, appurtenance, <br />or property caused by its activities at the site and shall schedule and complete <br />repairs as soon as possible, at its expense. KING COUNTY will submit a repair <br />schedule to the City's Operation Superintendent within 72 hours from the time <br />damage occurred or is initially noted by KING COUNTY or City personnel. Any repair
The URL can be used to link to this page
Your browser does not support the video tag.