My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Associates, Inc. 7/1/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Kimley-Horn and Associates, Inc. 7/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2024 2:56:17 PM
Creation date
7/1/2024 2:55:26 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kimley-Horn and Associates, Inc.
Approval Date
7/1/2024
Council Approval Date
6/26/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Corey N. Hert
Subject / Project Title
Safe Streets and Roads for All Safety Action Plan
Tracking Number
0004412
Total Compensation
$985,451.97
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EXHIBIT A – SCOPE OF WORK <br />17 <br /> <br />CONSULTANT will submit the Final SAP to CITY for public posting. <br />9.4 COUNCIL/COMMITTEE PRESENTATIONS <br />CONSULTANT will present the final SAP Report to one City Council Meeting/Transportation <br />Committee Meeting <br />Deliverables: Safety Action Plan Report (v01, v02, v03, Final), SAP Workshop #4, Council/Committee <br />presentations. <br />Task 10. Progress and Transparency <br />Purpose: Prepare performance measures to report long-term progress. <br />CONSULTANT will prepare a reporting plan for the CITY to document and report progress <br />toward SAP implementation. The reporting plan will outline methods and format to report <br />progress towards SAP implementation. The reporting plan will include implementation <br />responsibility, frequency of reporting (e.g., annually by CITY), and will outline performance <br />metrics such as status of SAP recommendations (not-funded, in-progress, implemented). <br />Performance Reporting Framework will be included in the SAP Final Report. <br />Additional Services <br />Management Reserve: CONSULTANT will provide work directed by the City under the existing <br />scope of work. A not to exceed budget allocation for Management Reserve has been provided <br />in Exhibit B. <br /> <br />FINAL MEMOS AND REPORTS DELIVERABLES SUMMARY <br />● Tech Memo: Safety Analysis <br />● Tech Memo: Community Engagement Summary <br />● Tech Memo: Policy Review Tech Memo <br />● Tech Memo: Neighborhood Traffic Calming Tech Memo <br />● Tech Memo: Complete Streets Checklist Updates <br />● Tech Memo: Posted Speed Limit Policy Recommendations Tech Memo <br />● Tech Memo: Recommended Strategies and Countermeasures <br />● Final Report: City of Everett Safety Action Plan <br /> <br />SCHEDULE <br />An initial schedule is attached. Schedule will be updated upon receipt of Notice to Proceed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.