Laserfiche WebLink
REQUIRED FORM: Construction Stormwater <br /> Pollution Prevention Plan (SWPPP) <br /> Include this form with the project's Construction SWPPP. The Construction SWPPP shall include a <br /> cover page, supporting narrative, related calculations, and TESC Plans in addition to this form. The <br /> Construction SWPPP is required to be kept by the contractor performing the work at the job site for <br /> reference, and the SWPPP shall be updated as needed throughout the duration of construction. <br /> . - - information <br /> Project Name: 9227 Duplex <br /> Project Address: 9227 4th Ave. W Permit Number: PW2301-001 <br /> Prepared by: Maher Welaye Date: 3/13/2023 <br /> Primary contact name: NAPA HOMES Primary contact phone: 425-268-2515 <br /> Adis Zizak Primary contact email: NAPAHDESIGN@GMAT <br /> 0 Task 1: Describe the project during construction. <br /> Nature and purpose of the construction project: <br /> This project proposes to remove existing single family house structure, detached garage, <br /> existing driveway and construct one new duplex structure and driveway access serving <br /> both units. <br /> Adjacent areas, including streams, lakes, wetlands, residential areas, and roads <br /> that might be affected by the construction project: <br /> Land use around the site is primarily single-family. There is an existing single family home <br /> structure and a detached garage to be demolished and removed. Access to the duplex will <br /> be through a new improved driveway in the same location as the exiting driveway from 4th <br /> Ave W. <br /> How upstream drainage areas may affect the site: <br /> From field observation and review of the available aerial topography, it appears that the <br /> site have no offsite flow. This project will not collect any offsite runoff. The site will be <br /> graded to direct runoff away from the structures and toward the east as in the existing <br /> condition. Refer to figure 4 for map of the surrounding area. <br /> There is no likelihood that the proposed project activities could impact upstream area with <br /> backwater conditions. <br /> Minimum Requirement#1-9 Project Forms City of Everett <br /> Construction Stormwater Pollution Prevention Plan (SWPPP) 11 Aug 2022 <br />