Laserfiche WebLink
Figure 1-3.1: Flow Chart for Determining Requirements for New <br /> Development <br /> Start Here <br /> Does the Site have 35°6 Yes Th Redevelopment Project <br /> or more of existing hard Thresholds and the Figure 'Flow <br /> surface coverage? Chart for Determining <br /> Requirements for Redevelopment'. <br /> No <br /> Does the Project convert 3/4 <br /> acres or more of vegetation to <br /> Does the Project result in lawn or landscaped areas,or <br /> 5,000 square feet,or No convert 2.5 acres or more of <br /> greater,of new plus native vegetation to pasturel <br /> replaced hard surface <br /> area? <br /> No <br /> Yes <br /> Yes Does the Project result in 2,000 <br /> _ square feet,or greater,of new plus <br /> All Minimum Requirements replaced hard surface area? <br /> apply to the new and replaced <br /> hard surfaces and converted Yes NO <br /> vegetation areas. T <br /> Does the Project have land <br /> Minimum Requirements 01 disturbing activities of 7.000 <br /> through#5 apply to the new Yes square feet or greater? <br /> and replaced hard surfaces <br /> and the land disturbed. No <br /> Minimum Requlromant 02 <br /> applites. <br /> wl`� Flow Chart for Determining Requirements for <br /> New Development <br /> D E P A P`MEN— OF Revsw Marcn 231 y <br /> ECOLOGYplease see httplhvww.ecy we govlcoryright.htmf for copyright notice inducing permissions, <br /> State of Washington bmi.atlor of liability,and dlsdaimer. <br /> 2019 Stormwater Management Manual for Western Washington <br /> Volume t-Chapter 3-Page 89 <br /> Drainage Report—9227 4t"Ave W Everett,WA 98204 <br /> Nov. 10,2022 Page 5 <br />