My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Plumbing & Pumps LLC DBA Allied Trenchless 7/8/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Allied Plumbing & Pumps LLC DBA Allied Trenchless 7/8/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 9:23:49 AM
Creation date
7/9/2024 9:11:07 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Plumbing & Pumps LLC DBA Allied Trenchless
Approval Date
7/8/2024
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
20th Street Sewer Rehabilitation Projec
Tracking Number
0004427
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 2113 - 12 <br /> <br /> <br />Instructions to Bidders <br />002113-12 202082-10 May 2024 <br />pw://Carollo/Documents/WA/Everett/202082-100000/04 Design/04 Specs/Carollo/002113 (FS-100) <br /> <br />5. Bid Security: This form is to be executed by the Bidder and the surety company <br />unless Bid is accompanied by a certified or cashier’s check, as required by these <br />instructions. The amount of the bond or cashier’s check, which shall be not less <br />than five percent of the Total Bid Amount, may be shown in dollars or on a <br />percentage basis. <br />6. RCW 35.22.650 Certification: To be filled in and signed by the Bidder. <br />7. Non-Collusion Affidavit: To be signed, notarized and submitted with the Bid. <br />Failure to complete and fully execute the aforementioned forms and to submit them with <br />the Bid may result in rejection of Bid. <br />Forms for Submission after Award of Contract <br />The following forms are to be executed after the award of Contract: <br />1. Contract: This Contract to be executed by the successful Bidder with the City’s <br />AdobeSign system within 14 calendar days after the award date. <br />2. Payment and Performance Bonds: These forms are to be executed by the <br />successful Bidder and the Bidder’s surety company. The amount of these bonds <br />shall be 100 percent of the Total Bid and shall be submitted with the Contract. <br />3. Proof of Insurance: Insurance certificates and endorsements shall be obtained and <br />maintained in force in accordance with SECTION 00 7200, Part 15 “Liability and <br />Insurance”, of the Contract Documents. <br />4. Power of Attorney: Attorneys-in-fact who sign bid bonds or contract bonds must file <br />with each bond a certified and effectively dated copy of their Power of Attorney. <br />5. Statement of Intent to Pay Prevailing Wage (L&I Form F700-029-000) and Affidavit <br />of Wages Paid (F700-007-000) from the Contractor, Subcontractor and agents to <br />the Subcontractor shall be submitted to the Employment Standards Division, State <br />Department of Labor and Industries, Olympia, Washington. If the prime contract is <br />over $1,000,000, then Contractor also needs to submit L&I Form F700-164-000 <br />(Affidavit of Wages Paid EHB 2805 Addendum). <br />6. Weekly Statement with Respect to Payment of Wages (U.S. Dept of Labor Form <br />WH347): Contractors, Subcontractors, and agents to Subcontractors using Payroll <br />Form WH347 may use State of Compliance found on the back of the form. <br />7. Weekly Statement of Compliance (U.S. Dept of Labor Form WH348). Contractors, <br />Subcontractors, or agents to Subcontractors not using Payroll Form WH347 shall <br />attach the Statement of Compliance Form WH348 to each payroll. <br />8. Approval of Subcontractors: Contractors shall request approval of Subcontractors <br />on a form provided by the City prior to their working on the Site. <br />9. Construction Progress Schedule: To be submitted as required by Section 00 7200, <br />Part 5 “Progress and Completion”, of the Contract Documents by the Contractor <br />within ten calendar days, or such time as determined by the City, after the date of <br />receipt of Notice to Proceed. <br />10. Traffic Control Plan: Standard Traffic Control Plans are included in the City’s <br />Design and Construction Standards. If, and to the extent, such plans are not <br />sufficient, complete or adequate to support the Bidder’s planned means and <br />methods of performing the Work, the Bidder must develop an adequate, complete <br />and sufficient traffic control plan at its cost, that shall be submitted for the City’s
The URL can be used to link to this page
Your browser does not support the video tag.