My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Viking Construction Group 7/9/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Viking Construction Group 7/9/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:46:07 PM
Creation date
7/9/2024 3:37:34 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Viking Construction Group
Approval Date
7/9/2024
Department
Facilities
Department Project Manager
Joan Olsen
Subject / Project Title
Police Facilities Upgrades at PHQ and South Precinct
Tracking Number
0004428
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 73 00 - 1 <br /> <br /> <br />00 73 00 - 1 SPECIAL CONDITIONS <br /> <br />SECTION 00 73 00 - SPECIAL CONDITIONS <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. The following “Special Conditions” shall supplement the General Conditions and shall <br />become a part of this contract: <br />PART 2 - WORKING HOURS <br />2.1 General Contractor will be required to provide a project schedule that clearly defines <br />each phase of work including planned facility closure(s), length of time area(s) is/are to <br />be closed, and projected reopening of affected area(s). <br />2.2 Work Hours: The Contractor shall provide work schedule. Facility will be occupied during <br />construction. The Contractor will have limited access to facility. Work hours will be 8am <br />to 4pm, Monday – Friday. <br />A. The City has established regulations for control of noise in residential zoned property. <br />For the purpose of regulating potential disruptive or annoying noise, Ordinance No. <br />1556-89 states that all residential zoned land fall within Noise Control No. 1. <br />1. Therefore, it should be noted that under the City’s Noise Ordinance, construction <br />related noise is limited to the following hours: <br />a. 7:00 AM to 10:00 PM on weekdays <br /> 8:00 AM to 6:00 PM on weekends and state recognized holidays. <br />2.3 Be aware that all construction sites will be monitored and violators are subject to fines. <br />2.4 Construction contractors are responsible for notifying subcontractors of the City’s noise <br />regulations. <br />2.5 (Discussion of altering business operating schedule will be determined at Pre- <br />Construction Meeting) Other hours may be considered on a limited basis without <br />interruption of Owner’s normal operations (Owner will determine if proposed work may <br />interrupt Owner’s operations). All requests for working hours other than those stated <br />above shall be made exclusively through the Owner’s Representative. <br />PART 3 - Security Screening and Protocols <br />A. As work will be performed in highly sensitive areas, the City of Everett requires the <br />General Contractor and the designated Site Supervisor(s) to pass individual background
The URL can be used to link to this page
Your browser does not support the video tag.