Laserfiche WebLink
City of Everett 00 73 00 - 1 <br /> <br /> <br />00 73 00 - 1 SPECIAL CONDITIONS <br /> <br />SECTION 00 73 00 - SPECIAL CONDITIONS <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. The following “Special Conditions” shall supplement the General Conditions and shall <br />become a part of this contract: <br />PART 2 - WORKING HOURS <br />2.1 General Contractor will be required to provide a project schedule that clearly defines <br />each phase of work including planned facility closure(s), length of time area(s) is/are to <br />be closed, and projected reopening of affected area(s). <br />2.2 Work Hours: The Contractor shall provide work schedule. Facility will be occupied during <br />construction. The Contractor will have limited access to facility. Work hours will be 8am <br />to 4pm, Monday – Friday. <br />A. The City has established regulations for control of noise in residential zoned property. <br />For the purpose of regulating potential disruptive or annoying noise, Ordinance No. <br />1556-89 states that all residential zoned land fall within Noise Control No. 1. <br />1. Therefore, it should be noted that under the City’s Noise Ordinance, construction <br />related noise is limited to the following hours: <br />a. 7:00 AM to 10:00 PM on weekdays <br /> 8:00 AM to 6:00 PM on weekends and state recognized holidays. <br />2.3 Be aware that all construction sites will be monitored and violators are subject to fines. <br />2.4 Construction contractors are responsible for notifying subcontractors of the City’s noise <br />regulations. <br />2.5 (Discussion of altering business operating schedule will be determined at Pre- <br />Construction Meeting) Other hours may be considered on a limited basis without <br />interruption of Owner’s normal operations (Owner will determine if proposed work may <br />interrupt Owner’s operations). All requests for working hours other than those stated <br />above shall be made exclusively through the Owner’s Representative. <br />PART 3 - Security Screening and Protocols <br />A. As work will be performed in highly sensitive areas, the City of Everett requires the <br />General Contractor and the designated Site Supervisor(s) to pass individual background