Laserfiche WebLink
City of Everett 01 25 00 - 6 <br /> <br /> <br />01 25 00 - 6 SUBSTITUTION PROCEDURES <br /> <br />G. Substitutions will not be considered if they are indicated or implied on shop drawings or <br />other project data submittals, without proper notice shown on Section 00 63 25. <br />H. WORK-RELATED SUBMITTALS: Contractor's submittal of, and Architect's acceptance <br />of, shop drawings, product data or samples which indicate work not complying with <br />requirements of contract documents, does not constitute an acceptable and valid request <br />for, nor approval of, a substitution. <br />I. GENERAL CONDITIONS: To this extent this Section is inconsistent with Subsection 8.5 <br />of Section 007200 General Conditions, the requirement most stringent on the Contractor <br />governs. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION 01 25 00