My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Viking Construction Group 7/9/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Viking Construction Group 7/9/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:46:07 PM
Creation date
7/9/2024 3:37:34 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Viking Construction Group
Approval Date
7/9/2024
Department
Facilities
Department Project Manager
Joan Olsen
Subject / Project Title
Police Facilities Upgrades at PHQ and South Precinct
Tracking Number
0004428
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 26 00 - 2 <br /> <br /> <br />01 26 00 - 2 CONTRACT MODIFICATION PROCEDURES <br /> <br />B. When requested, the Contractor shall provide pricing per 1.01 C of this section for review <br />and approval by the Owner, prior to proceeding with the work. <br />1.4 CHANGE ORDERS <br />A. A change order to the work will be issued including one or more Request for Change <br />Proposals. The cumulative amount of adds and deducts along with the change in the <br />number of days approved in each individual RFCP shall be added to or deducted from <br />the Contract. The change order shall incorporate the RFCP forms, and all required back <br />up documentation into a lump sum contract adjustment. <br />B. The payment for work performed under the change order cannot be made until the <br />change order has been signed and approved as per 00 72 00-6. <br />C. If an individual change order exceeds 10% of the original contract amount and is over <br />$50,000, a special review may be required by the Owner. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION 01 26 00
The URL can be used to link to this page
Your browser does not support the video tag.