My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Viking Construction Group 7/9/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Viking Construction Group 7/9/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:46:07 PM
Creation date
7/9/2024 3:37:34 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Viking Construction Group
Approval Date
7/9/2024
Department
Facilities
Department Project Manager
Joan Olsen
Subject / Project Title
Police Facilities Upgrades at PHQ and South Precinct
Tracking Number
0004428
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 31 13 - 2 <br /> <br /> <br />01 31 13 - 2 PROJECT COORDINATION <br /> <br />1.7 The Contractor shall be responsible for the adequacy, efficiency and sufficiency of <br />subcontractors, manufacturers, suppliers and their employees. <br />1.8 Contractor shall be responsible for the adequacy, efficiency and sufficiency of its <br />employees. Workers shall have sufficient knowledge, skill and experience to perform <br />properly the work assigned to them. <br />1.9 Coordination between adjacent business that utilize the adjoining alley and easement <br />shall be thru the owner. Every effort shall be made to reduce the impact of this project <br />to any adjacent business. Access thru the alley and easement is critical throughout this <br />project. <br />1.10 The Contractor shall coordinate and work with the artists whom are performing work on <br />the owners’ behalf. <br />1.11 All tenants operating and performing business on the Site shall be kept appraised of the <br />work that is commencing. Every effort shall be made to reduce the impacts of this project <br />to the business operating on Site. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION 01 31 13
The URL can be used to link to this page
Your browser does not support the video tag.