My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Viking Construction Group 7/9/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Viking Construction Group 7/9/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:46:07 PM
Creation date
7/9/2024 3:37:34 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Viking Construction Group
Approval Date
7/9/2024
Department
Facilities
Department Project Manager
Joan Olsen
Subject / Project Title
Police Facilities Upgrades at PHQ and South Precinct
Tracking Number
0004428
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 35 29 - 1 <br /> <br /> <br />01 35 29 - 1 HEALTH AND SAFETY <br /> <br />SECTION 01 35 29 - HEALTH AND SAFETY <br />PART 1 - GENERAL <br />1.1 SECTION INCLUDES <br />A. This Section covers the requirements for compliance with health and safety precautions <br />and controls for projects without hazardous waste operations. <br />B. Safety plan. <br />C. Protection of equipment, public and city staff. <br />1.2 REFERENCES <br />A. General: The publications listed below form a part of these specifications to the extent <br />referenced. The publications are referred to in the text by basic designations only. <br />B. Code of Federal and State Regulations <br />1. OSHA General Industry Safety and Health Standards (29 CFR 1910), Publication <br />V2206; OSHA Construction Industry Standards (29 CFR 1926.) <br />2. National Emission Standards for Hazardous Air Pollutants (40 CFR, part 61). <br />3. Washington State Department of Labor and Industries (WISHA) 49.17-49.26 RCW <br />4. Washington Administration Code (WAC) 296-155 Safety Standards for <br />Construction Work <br />1.3 SUBMITTALS <br />A. The following submittals are required to be delivered within 5 days after Notice to <br />Proceed has been received. <br />1. Health and Safety Plan (specific to this project) <br />2. Fall Protection Plan Specific to each building. <br />3. Copies of all minutes/notes from daily safety meetings. <br />1.4 ACCIDENT REPORTING <br />A. Serious accidents such as those resulting in treatment of an injury at a medical facility, <br />response to the site by emergency medical personnel or damage to property other than <br />that of the Contractor shall be reported to the Owner within twenty-four (24) hours of the <br />occurrence. <br />B. A copy of each accident report, which the Contractor or subcontractors have submitted <br />to their insurance carriers, shall be forwarded to the Owner as soon as possible, but in <br />no event later than seven (7) calendar days after the accident occurred.
The URL can be used to link to this page
Your browser does not support the video tag.