My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Viking Construction Group 7/9/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Viking Construction Group 7/9/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:46:07 PM
Creation date
7/9/2024 3:37:34 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Viking Construction Group
Approval Date
7/9/2024
Department
Facilities
Department Project Manager
Joan Olsen
Subject / Project Title
Police Facilities Upgrades at PHQ and South Precinct
Tracking Number
0004428
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 35 29 - 2 <br /> <br /> <br />01 35 29 - 2 HEALTH AND SAFETY <br /> <br />1.5 PLAN <br />A. The Contractor shall develop a Site Specific Health and Safety Plan addressing health <br />and safety management methods specific to the project. The Plan shall, at a minimum, <br />include: <br />1. The name of the individual at the jobsite responsible for implementation and <br />compliance with this Plan. <br />2. If work requires the use of Fall Restraint or Fall Arrest, a Fall Protection work plan <br />meeting the requirements set forth in WAC 296-155-24505 shall be included. <br />3. If applicable, the Plan shall include the name and qualifications of any electrical <br />safety observer to be provided by the Contractor. <br />4. Steps taken to provide Protection of the Public and City Employees. This includes <br />protection from falling objects. Indicated type of overhead safe guards and <br />protection to be installed and safeguards from equipment damage due to debris <br />(including nails) on the ground. <br />5. A description of tasks to be undertaken, and equipment mobilized for this project. <br />6. A list of all known and expected safety or health hazards, problems, and proposed <br />control mechanisms. <br />7. Material Safety Data Sheets (MSDS) of and procedures for using, disposing of, or <br />storing for all chemicals, products, or materials regulated by WAC 296-62 to be <br />used by the Contractor. <br />8. A list of personal protective equipment, monitoring devices, and hazard-specific <br />plans or permits as appropriate and required by State and Federal regulations. <br />9. A description of emergency response measures, equipment available for <br />emergency response to address accidents and releases of materials, including, <br />but not limited to, first aid, eye wash/showers, and fire extinguishing equipment, <br />and location of this equipment at the jobsite. <br />10. Emergency phone numbers contacts, and location of the nearest medical facility. <br />11. A monitoring and inspection plan and record keeping measures to ensure that <br />equipment and work practices comply with this Plan. <br />12. Personnel names, training and notification procedures as appropriate to ensure <br />that all jobsite personnel are familiar with the Plan elements. Include copies of <br />training certificates. <br />13. Procedures for safe storage and handling of flammable liquids, in accordance with <br />WAC 296-24-330. <br />14. If applicable the Contractor shall include procedures for safe storage and handling <br />of compressed gasses in accordance with WAC 296-24-295, Compressed Gas <br />General Requirement. <br />15. Other issues which the Contractor determines are appropriate and necessary to <br />protect worker safety and health. <br />16. This plan shall be posted and marked in a location on site that will be noticed upon <br />entry of work site. A fall protection plan must also be established and shall be <br />posted next to the Health and Safety Plan (Accident Prevention Program). These <br />postings are required to be protected from inclement weather and must be legible <br />during the extent of this contract. <br />1.6 HEALTH AND SAFETY REPRESENTATIVE <br />A. The Contractor shall designate a Health and Safety Representative who will oversee all <br />work taken place on the job site including work performed by subcontractors and
The URL can be used to link to this page
Your browser does not support the video tag.