Laserfiche WebLink
City of Everett 01 35 53 - 1 <br /> <br /> <br />01 35 53 - 1 SECURITY PROCEDURES <br /> <br />SECTION 01 35 53 - SECURITY PROCEDURES <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. Section Includes: Procedures to maintain security including unauthorized entry, <br />vandalism, and theft to buildings and grounds at Project site. <br />B. Related Sections: <br />1. Section 01 31 19 – Project Meetings <br />2. Section 01 50 00 – Temporary Facilities and Controls <br />3. Section 00 73 00 – Special Conditions – Security Screening and Protocols <br />1.2 SECURITY PROGRAM <br />A. Arrange with Owner, at Preconstruction Meeting specified Section 01 3119, to set up <br />security program to prevent unauthorized entry and to protect against other security <br />problems, including loss due to theft, vandalism, and fire. <br />B. Arrange with Owner for access keys as necessary to perform Work of this Contract. <br />1. Keys Issued by Owner: Do not duplicate. Return to Owner at Final Completion. <br />2. Keys not returned: Re-key locks at Contractor's expense and provide new keys <br />conforming to keying types required by Owner. <br />C. Establish adequate flood lighting to allow monitoring of Project site during evening <br />hours. <br />1.3 STORAGE AND PROTECTION <br />A. Provide for secure lockup of stored materials and take additional measures to protect <br />against theft vandalism, and other loss of property belonging to Owner located on site <br />and at off-site facilities. <br />1.4 ENTRY CONTROL <br />A. Restrict entrance of unauthorized persons and vehicles into construction areas. <br />B. Maintain log with names and dates of those who enter site. <br />C. Maintain security of construction fencing and gates as approved by Owner in advance. <br />Lock at end of each working day. <br />D. Maintain security site lighting systems as approved by Owner in advance.