My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Viking Construction Group 7/9/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Viking Construction Group 7/9/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:46:07 PM
Creation date
7/9/2024 3:37:34 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Viking Construction Group
Approval Date
7/9/2024
Department
Facilities
Department Project Manager
Joan Olsen
Subject / Project Title
Police Facilities Upgrades at PHQ and South Precinct
Tracking Number
0004428
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 35 29 - 3 <br /> <br /> <br />01 35 29 - 3 HEALTH AND SAFETY <br /> <br />suppliers. The Health and Safety Rep should be capable of identifying hazards within <br />the job site, take immediate actions to correct hazard and if needed, stop work until <br />hazards have been corrected. <br />B. The Contractor shall authorize the Health and Safety Representative to resolve safety- <br />related issues raised by the Owner. <br />C. The Health and Safety Representative is responsible to insure that work is performed in <br />accordance with the Health and Safety Plan. <br />D. At the daily job briefing and/or tailgate conference, Contractor shall provide the Owner's <br />representative in attendance at the meeting all relevant information on the Work to be <br />performed, its location, and the equipment to be used. <br />E. The Contractor is responsible to insure that its workers and subcontractors have all <br />safety equipment required for the Work. <br />F. Nothing in this Contract shall be construed as imposing any duty upon the Owner or any <br />of its employees with regard to, or as constituting any express or implied assumption of <br />control or responsibility over, Project Site safety, or over any other safety conditions <br />relating to employees or agents of Contractor or any of its Subcontractors, or the public. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION 01 35 29
The URL can be used to link to this page
Your browser does not support the video tag.