My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Viking Construction Group 7/9/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Viking Construction Group 7/9/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:46:07 PM
Creation date
7/9/2024 3:37:34 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Viking Construction Group
Approval Date
7/9/2024
Department
Facilities
Department Project Manager
Joan Olsen
Subject / Project Title
Police Facilities Upgrades at PHQ and South Precinct
Tracking Number
0004428
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 63 25 - 1 <br /> <br /> <br />00 63 25 - 1 SUBSTITUTION REQUEST FORM <br />SECTION 00 63 25 - SUBSTITUTION REQUEST FORM <br /> <br />PROJECT: POLICE FACILITIES UPGRADES <br />REQUEST NO.: <br /> <br />CONTRACTOR: DATE: <br />We hereby submit for consideration, following product instead of specified item for <br />above project: <br />Section Specified Item <br /> <br />Proposed Substitution <br />Attach complete technical data, including laboratory tests, and samples, as applicable. <br /> <br />Attach detailed comparison of the significant qualities (size, weight, durability, <br />performance and similar characteristics, and including visual effect where applicable) for <br />the proposed substitution in comparison with the original requirements. <br /> <br />List complete installation changes and changes to Drawings and Specifications required <br />by proposal. <br /> <br />Fill in Blanks Below: <br />A. Does substitution require change in Drawing dimensions? <br />B. Will Undersigned pay for resulting building design changes including engineering <br />and detailing costs? <br /> <br />C. What effect does substitution have on other trades? <br />D. Differences between proposed substitution and specified item? <br />E. Manufacturer's guarantees of proposed and specified items are: <br /> Same _____ Different (Explain on attachment) <br />F. Name and address of three (3) similar projects on which product was used, and <br />date of installation <br /> <br />G. Contract completion date is: _____Same ______Different (Explain on attachment).
The URL can be used to link to this page
Your browser does not support the video tag.