My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Viking Construction Group 7/9/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Viking Construction Group 7/9/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:46:07 PM
Creation date
7/9/2024 3:37:34 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Viking Construction Group
Approval Date
7/9/2024
Department
Facilities
Department Project Manager
Joan Olsen
Subject / Project Title
Police Facilities Upgrades at PHQ and South Precinct
Tracking Number
0004428
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 63 25 - 2 <br /> <br /> <br />00 63 25 - 2 SUBSTITUTION REQUEST FORM <br />H. Cost Savings? <br />Undersigned attests function and quality equivalent or superior to specified item and waives his <br />rights to additional payment and time which may subsequently be necessitated, by failure of the <br />substitution to perform adequately, and for the required work to make corrections thereof. <br />Signature must be by a person having authority to legally bind his firm to the above terms. <br />Failure to provide legally-binding signature will result in approval retraction. <br />Submitted by: <br /> ______________________________ <br />Signature Date <br />__________________________________________ <br />Printed <br /> <br />______________________________________________________________________ <br />Firm <br />______________________________________________________________________ <br />Address <br /> <br />______________________________________________________________________ <br />Telephone <br /> <br />For use by Architect/Engineer: <br />______ Accepted _____ Accepted as Noted___ Not Accepted _____ Received Too <br />Late <br />BY: Date: <br />Remarks: <br /> <br />For use by Owner: <br />______ Accepted ____ Accepted as Noted___ Not Accepted ___ Received Too Late <br /> <br />______________________________________________________________________ <br />Project Manager Date <br />Remarks: <br /> <br />______________________________________________________________________ <br /> <br />END OF SECTION 00 63 25
The URL can be used to link to this page
Your browser does not support the video tag.