My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Elcon Associates, Inc. 7/17/2024 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Elcon Associates, Inc. 7/17/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 3:02:01 PM
Creation date
7/18/2024 3:01:46 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Elcon Associates, Inc.
Approval Date
7/17/2024
End Date
12/31/2025
Department
Transportation Services
Department Project Manager
Brad Chenoweth
Subject / Project Title
College & Seaway Inductive Charging Stn-Engineering Svcs
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003437
Total Compensation
$202,670.65
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of EverettInductive Charging Field Installation for Seaway Transit Center, College Station, and Everett Station - RFQ No. 2021-134 Dimitri Siaterlis Kinh Pham Nick Meusch Curtis Smith Deanna Siaterlis Mitch Wagner3-Jul-24 ProjectManager QA/QC Planner Sr. Electrical Designer Electrical Engineer Electrical Engineer Billing Rate (2022)220.00$ 220.00$ 90.00$ 140.00$ 105.00$ 105.00$ CA Support Addidional Fee ProposalTask #Scope of Services01 Electrical Engineering and Design02 Construction Bid Documents03 Construction Management Support3.1Construction Meetings Bi-weekly (10 mtgs)15153.2Respond to Contractor's RFIs (4 RFIs)48 43.3Review Contractor Submittals (4 submittals)28 83.4Charge Orders (1 change order)243.5Site Visits (4 site visits - 1 per month plus 1 for final inspection)843.6Provide Final Punch List2 2 43.7Updated Record Drawings per Contractor's Mark-ups28 43.8Review of O&M Manuals and Project Closeout24 200Total Hours 35 0 0 34 24 0197,700.00$ -$ -$ 4,760.00$ 2,520.00$ -$ 14,980.00$ ExpensesMileage:Elcon Associates, Inc's Subtotal Budget (Not to Exceed)14,980.00$ Civil Subconsultant KPFF Engineers 26,027.00$ 4% OH on KPFF's Fee Proposal 1,041.08$ Total Project Budget (Not to Exceed)42,048.08$ Total Cost by StaffTotalHours
The URL can be used to link to this page
Your browser does not support the video tag.