Laserfiche WebLink
<br /> <br /> <br /> <br />July 3, 2024 <br /> <br /> <br /> <br />Mr. Dimitri Siaterlis, PE <br />Elcon Associates, Inc. <br />16300 Christensen Road, Suite 330 <br />Seattle, WA 98188 <br /> <br />Subject: Civil Engineering Services Proposal for the Everett Transit Inductive Chargers <br />Construction Administration – College Station and Seaway Transit Center <br /> <br />Dear Dimitri: <br /> <br />We are appreciative of this opportunity to submit this proposal to provide additional construction <br />administration related services in support of our civil engineering design work associated with <br />the Everett Transit’s Inductive Charger Installation project. Our scope of work is based on our <br />understanding of the remaining effort needed to complete the construction phase for the project. <br /> <br />SCOPE OF WORK <br /> <br />A summary of the civil engineering-related scope is shown below: <br /> <br />TASK 1 – CONSTRUCTION ADMINISTRATION <br /> <br />Everett Transit will serve as the construction manager and direct point of contact for the <br />contractor. KPFF will support the construction management team by providing construction <br />administration services as described herein and providing construction support as needed. <br />1.1 Construction Meetings <br />Everett Transit will lead construction meetings throughout the duration of construction. <br />KPFF anticipates that there may be a need to participate in or attend some of these <br />meetings. <br />For budgeting purposes, up to two KPFF team members will attend up to two of these <br />construction meetings. <br />1.2 Requests for Information (RFIs) <br />Everett Transit will receive, log, and distribute contractor RFIs to the consultant. The <br />consultant will review and provide written responses back to Everett Transit for <br />coordination with the contractor. <br />For budgeting purposes, KPFF estimates there will be up to four RFIs reviewed and <br />responded to. <br />