My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/07/10 Council Minutes
>
Council Minutes
>
2024/07/10 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 4:49:28 PM
Creation date
7/18/2024 4:49:16 PM
Metadata
Fields
Template:
Council Minutes
Date
7/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
July 10, 2024 <br />3 <br /> <br />To adopt Resolution No. 8043 authorizing claims against the City of Everett in the amount of <br />$3,549,130.63 for the period ending June 15, 2024, through June 21, 2024. <br /> <br />RESOLUTION - CLAIMS <br /> <br />To adopt Resolution No. 8044 authorizing claims against the City of Everett in the amount of <br />$4,421,062.69 for the period ending June 22, 2024, through June 28, 2024. <br /> <br />RESOLUTION – ELECTRONIC TRANSFER CLAIMS <br /> <br />To adopt Resolution No. 8045 authorizing electronic transfer claims against the City of Everett <br />in the amount of $9,015,478.01 for the period May 1, 2024, through May 31, 2024. <br /> <br />RESOLUTION – PAYROLL CLAIMS <br /> <br />To adopt Resolution No. 8046 authorizing payroll claims against the City of Everett in the <br />amount of $5,617,221.01 for the period ending June 15, 2024. <br /> <br />AGREEMENT AMENDED – RESERVOIR 3 REPLACEMENT PROJECT <br /> <br />To authorize the Mayor to sign Supplemental Agreement No. 1 to the Professional Services <br />Agreement with HDR Engineering, Inc. for Phase 1 Engineering Construction Services, and <br />Phase 2 Design and Bid Support Services for the Reservoir 3 Replacement Project in the amount <br />of $1,049,052. <br /> <br />AGREEMENT – LEASE AT 2000 HEWITT AVENUE. <br /> <br />To authorize the Mayor execute Lease Amendment No. 4 with Everett Physical Therapy and <br />Sports Performance Center, PLLC at 2000 Hewitt Avenue. <br /> <br />AWARD - 20TH STREET SEWER REHABILITATION PROJECT <br /> <br />To award the contract for the 20th Street Sewer Rehabilitation Project to Allied Trenchless in <br />the amount of $2,384,775.05, which includes Washington State Sales Tax. <br /> <br /> <br />Roll was called with all council members voting yes. <br /> <br />Motion carried. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.