Laserfiche WebLink
r <br /> Task 3: Attach Project Specific Stormwater Site Plan Drawings (required) <br /> See City of Everett standard drawings##100-104 for stormwater site plan requirements and <br /> examples,including a Temporary Erosionl&Sediment Control(TESC)plan drawing <br /> example and drainage plan drawing example,available online <br /> at:everettwa.gov/DocumentCenter/View/7040 <br /> Task 4: Attach Topographic Survey (if applicable) ` <br /> A topographic survey prepared by,a registered land surveyor, civil engineer or other <br /> qualified professional is required if your project site includes steep slopes,critical areas, <br /> flood or geologic hazards or at the discretion of the stormwater reviewer. <br /> Task 5: Attach Declaration of Covenant <br /> To ensure future maintenance and allow,access for inspection, any development <br /> project which constructs stbrmwater facilities must have a Declaration-of Covenant. <br /> Fill out and attach the Declaration of Covenant.A copy can be found at the following <br /> link: <br /> https://www.everettwa.gov/Docu mentCenter/View/23449/Small-Project-Declaration- <br /> of-Covenant-for-Inspection-and-Maintenance-of-Onsite-Stormwater-BMPs. <br /> i <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 9 <br /> the Combined Sewer Area-September 2022 <br /> .I <br />