Laserfiche WebLink
i <br /> Step 4. Construction Stormwater Pollution Prevention <br /> (SWPPP) <br /> All new development and redevelopment projects are responsible for preventing erosion and discharge of <br /> sediment and other pollutants into receiving waters.A Construction Stormwater Pollution Prevention Plan <br /> (Construction SWPPP) is designed to be a stand-alone document that addresses construction stormwater <br /> management concerns'!A copy of this SWPPP is required to be kept bythe contractor performingthe work at <br /> the jobsite for reference and updating'during the duration of construction. <br /> Construction SWPPP drawings � k <br /> Provide a Temporary Erosion and Sediment Control (TESC) plan for your project. <br /> Show on yourTESC Plan all BMPs selected above to satisfythe 13 Elements on your <br /> TESC Plan. <br /> ■ Se e City of Everett Public Works Standard Plan 103-TESC Plan Example <br /> ev,erettwa.gov/DocumentCenter/View/7040 <br /> Note:Constriction StormwaterPollution Prevention Plans(Construction SWPPPs)that <br /> involve engineering calculations must also be prepared by or underthe direction of a <br /> Washington State licensed professional engineer. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 90 <br /> the Combined Sewer Area-September 2022 <br /> I <br />