X_ <br /> Step S. Flow Control <br /> All projects triggering!the flow control thresholds shall employ flow control BMPsto infiltrate, <br /> disperse or detain stormwater runoff on-site to meet the flow control requirements of section 6.1 0 <br /> of the DCSS. Projects that create 2,000 sf or more of net new impervious area shall provide flow <br /> control designed by an Engineer. Use of the sizing tables below will not be allowed for projects <br /> with 2,000 sf or more net new impervious area. <br /> The three options for meeting the flow control requirement include dispersion, infilfration <br /> (infiltration trench or bioretention) and detention. <br /> Flow Control BMP Selection <br /> i <br /> Identify(check box of) the BMP that will be used to meet the flow control requirement <br /> in the table below. All BMP's shall'be designed to meet the flow requirements of <br /> Section 6.10 of the DCSS. <br /> SEE BMP EXAMPLES AT THE BACK OF THIS PACKET <br /> Table 1. Flow Control BMP Selection <br /> Option Type DCSS Design 2019 SWMMWW <br /> Requirement Design Guidance: <br /> Sections: <br /> Downspout BMP T5.1013: <br /> Dispersion <br /> System* OR <br /> BMP 5.30: ` <br /> 2A Infiltration 4-4.3 (2) BMP T5.10A: <br /> See re� <br /> Trench <br /> ❑ 2& Rain Gardens <br /> 4-4.3 (4) BM1PT7.30: <br /> j Bioretention COE Standard Plan See Figure V-5.12 <br /> Cells and,Swales 426 <br /> ❑ 3. Detention Section 4-4.4 BMP D.2 <br /> (2), and 4-44.4 or BMP D.3 <br /> (3) <br /> COE <br /> See Figure V12.1 <br /> . ' <br /> Standard <br /> Plans 415-418 <br /> *For roof runoff only.To provide flow control from other surfaces, use option 2 or 3. <br /> All facilities shall meet the facility access requirements of section 4-4.2, and Maintenance requirements of <br /> section 4-4.2(5) of Volume I of the DCSS. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 19 <br /> the Combined Sewer Area-September 2022 <br />