Laserfiche WebLink
FEE ESTIMATE AS OF 4/28/2020 <br />(Subject to Change as fees not noted are determined) <br />Project: RIVERFRONT PHASE <br />Address: 3910 RIVERFRONF BLVD (Phase 1 Site Work & Bldg B) <br />Public Works Permit (Phase 1 site work)*** Includes PW fees, Stormwater <br />system development fees for site work, and peer review invoices for this <br />permit through March 2020. Pending April or May peer review fees. <br />PW1912-048 <br />$ 915,354.34 <br />Building Permit" (Bldg B) Valuation $24,172,668. See fee breakdown on this <br />sheet. <br />B1912-032 <br />$ 168,443.85 <br />School Mitigation fee (442 bdrm units @ ($9,125) <br />B1912-032 <br />$ 400,500.00 <br />Traffic Mitigation" <br />B1912-032 <br />$ 104,786.00 <br />Water System Development Fees" for Domestic Service-BldgB <br />U2004-018 <br />$ 309,675.60 <br />Sewer System Development Fees" for Domestic Service-BldgB <br />U2004-018 <br />$ 388,926.00 <br />Stormwater System Development Fees" for Building B roof area <br />B1912-032 <br />$ 8,339.26 <br />6"Water Meter -Domestic - Cost Estimate""" <br />U2004-016 <br />pending <br />DCVA(Backflow Device) for Domestic Service <br />P2004-013 <br />$ 35.00 <br />3/4" Detect Meterfor4" Fire Service <br />U2007-017 <br />$ 540.00 <br />DCDA(Backflow Device) for Fire Service <br />P2004-015 <br />$ 35.00 <br />Irrigaion Meter #1 (Shown in phase 1 & 2 site work plans PW 1912-048) <br />U2004-026 <br />$ 1,115.00 <br />DCVA(Backflow Device) for Irrigation Service # 1 <br />U2004-026 <br />$ 35.00 <br />Water System Development Feefor Irrigation Service## <br />U2004-026 <br />$ 21,702.00 <br />Irrigaion Meter Jf2 (Shown in phase 1 & 2 site work plans PW 1912-048) <br />U2004-027 <br />$ 1,115.00 <br />DCVA(Backflow Device) for Irrigation Service#2 <br />U2004-027 <br />$ 35.00 <br />Water System Development Feefor Irrigation Service#2 <br />U2004-027 <br />$ 21,702.00 <br />Irrigaion Meter Jf3 (Shown in Riverfront Blvd plans PW1901-074) <br />U2004-028 <br />$ 1,115.00 <br />DCVA(Backflow Device) for Irrigation Service#3 <br />U2004-028 <br />$ 35.00 <br />Water System Development Feefor Irrigation Service N3 <br />U2004-028 <br />$ 21,702.00 <br />Irrigaion Meter Jf4(Shown in Riverfront Blvd plans PW197074) <br />U2004-029 <br />$ 1,115.00 <br />DCVA(Backflow Device) for Irrigation Service Jf4 <br />U2004-029 <br />$ 35.00 <br />Water System Development Feefor Irrigation Service Jf4 <br />U2004-029 <br />$ 21,702.00 <br />New Sewer Connection+ 2 connectionsto Building B <br />U2004-015 <br />$ 80.00 <br />Mechanical Permit <br />M1912-088 <br />$ 6,255.00 <br />Peer Review Fees (Consent Decree) through March 2020 Invoicing. See <br />breakdown on this sheet."' <br />B1912-032 <br />$ 34,615.86 <br />TOTAL: <br />$ 2,429,993.91 <br />Plan checkfee lad (transferred from B1912-036) <br />$ (1,373.94) <br />Plan checkfee lad (transferred from B1912-035) <br />$ (1,632.38) <br />Plan checkfee lad on B1912-0324/15/2020 <br />$ (50,858.08) <br />Estimated Total Fees Due*** <br />$ 2.375.129.51 <br />Building permit Fee Breakdown <br />Plan Check Fee $ 58,623.63 <br />Construction Permit Fee $ 90,190.20 <br />State Surcharge Fee $ 361.00 <br />Planning Bldg Permit Review Fee $ 9,019.02 <br />Fire Bldg Permit Review Fee $ 10,250.00 <br />$ 168,443.85 <br />Peer Review Fees for Consent Decree- Bldg B <br />Invoice #0010846 (March 2019) $ 2,213.11 <br />Invoice #0010973 (April 2019) $ 14,822.39 <br />Invoice #0011042 (May 2019) $ 2,106.67 <br />Invoice #0011595 (Dec 2019) $ 3,876.19 <br />Invoice #0011627 (Jan 2020) $ 3,882.50 <br />Invoice #0011761 (Feb 2020) $ 4,022.50 <br />Invoice #0011866 (March 2020) $ 3,692.50 <br />Invoice /iTBD(April 2020) pending -will receive by May 15 <br />Total: $ 34,615.86 <br />Peer Review Fees for Consent Decree-PW Phase 1 & 2 (PW3912-D49) <br />Invoice #0011595 (Dec 2019) $5,363.63 <br />Invoice #0011627 (Jan 2020) $4,025.00 <br />Invoice #0011761 (Feb 2020) $4,242.56 <br />Invoice #0011866 (March 2020) $1,896.25 <br />Invoice NTBD(April 2020)""" pending -will receive by May 15 <br />Total: $15,527.44 <br />PW Permit Fee Breakdown (PW3912-D49): <br />PW Plan Review Fee $ 198,480.00 <br />PW Site Inspection Fee $ 396,960.00 <br />Stormwater System Development Fee $ 304,386.90 <br />Total: $ 899,826.90 <br />Total with Peer Review (pending)""": $ 915,354.34 <br />"Please note that permits for plumbing, mechanical, electrical, sprinklers etc are not included and will have their own set of fees and requirements <br />**Water and sewer System Develompent fees are calculated for the 169 residential units only. Tenant space system development fees to be calculated with the tenant improvement permits. Fees <br />may be subject to change afterthe lst of the year. Be aware that as the new tenants applyfor their buildouts in the space, additional systems development fees may be due. <br />"Traffic Mitigation Fees determined by Michael Brickfrom TEN W Traffic Study. Includes residential units and system -side mitigation fee due underthe TMO and their proportionate share of two traffic <br />signals perthe DA. <br />"""Pending fees -still waiting on additional information, so this fee is subject to increase upon receipt of information. <br />