Laserfiche WebLink
CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> April 7, 2021 <br /> Mr. Larry Thibeault <br /> Email Address: rsalarry@hotmail.com <br /> RE: Owner: William & Katrina Trimble <br /> Job Address: 2706 21St Street <br /> Plan Check Number: B2111-005, First Building Review <br /> Dear Mr. Thibeault, <br /> The proposed project has been reviewed for compliance with the provisions of the building codes <br /> adopted and amended by the state of Washington and the city of Everett. The comments below <br /> must be addressed before a permit can be issued. These comments address building issues only. <br /> Additional comments may be issued by the Public Works, Planning, and Fire departments. <br /> Code citations provided in the following review comments reference the Everett Municipal Code <br /> (EMC), the 2018 International Residential Code (IRC), 2018 International Building Code (IBC), and <br /> the 2018 Washington State Energy Code (WSEC). Amendments to the adopted building codes by <br /> Washington Administrative Code (WAC) Title 51 are incorporated into the referenced code citations. <br /> Citations provided in the comments reference the IRC unless noted otherwise. The codes, <br /> including WAC amendments where applicable, can be viewed using the following links: <br /> • EMC: https://everett.municipal.codes/ <br /> 2018 IRC: https://up.codes/viewer/washington/wa-residential-code-2018 <br /> • 2018 IBC: https://up.codes/viewer/washington/wa-building-code-2018 <br /> • 2018 WSEC: https://up.cod es/vi ewer/washington/wa-energy-code-residential-provisions-2018 <br /> • WAC: https://apps.leg.wa.gov/wac/defauIt.aspx?cite=51 <br /> In order for the processing of your application to continue, the following documentation shall be <br /> submitted to Permit Services for review: <br /> a. Itemized letter addressing the comments provided below. <br /> b. Two complete sets of revised construction drawings. <br /> c. Two copies of supplemental structural calculations (if appliable). <br /> Submittal documents should contain sufficient information and detail to review the proposed project <br /> for compliance with the adopted building codes. Upon submittal of the revised documents, your <br /> application will be given priority and the review will recommence. <br /> Page 1 of 5 <br />