My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6307 36TH AVE W 2024-08-07
>
Address Records
>
36TH AVE W
>
6307
>
6307 36TH AVE W 2024-08-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2024 2:31:19 PM
Creation date
7/19/2024 2:03:51 PM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
6307
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT <br />WASHI NGTON <br />May 17, 2023 <br />CITY OF EVERETT <br />Permit Services <br />Bobby Vang <br />Ware Malcomb <br />3015 11211 Avenue NE, Suite 205 <br />Bellevue, WA 98004 <br />Email Address: bvang@waremalcomb.com <br />RE: Owner: Powdermill Phase 1, LLC <br />Job Address: 6307 36t" Avenue W, Building C <br />Plan Check Number: B2304-096, First Building Review <br />Hello, Bobby. <br />The proposed project has been reviewed for compliance with the provisions of the building codes <br />adopted and amended by the state of Washington and the city of Everett. The comments below <br />must be addressed before a permit can be issued. These comments address building issues only. <br />Additional revisions or additions may be required by other departments including Public Works, <br />Planning, and Fire. <br />Code citations provided in the following review comments reference the Everett Municipal Code <br />(EMC), the 2018 International Building Code (IBC), the 2018 International Existing Building Code <br />(IEBC), 2018 the Washington State Energy Code (WSEC), and the 2018 International Mechanical <br />Code (IMC). Additional reference standards are listed in IBC Chapter 35. Amendments to the <br />adopted building codes by Washington Administrative Code (WAC) Title 51 are incorporated into <br />the referenced code citations. <br />In order for the processing of your application to continue, the following documentation shall be <br />submitted to the Building Division for review: <br />a. Itemized letter addressing the comments provided below. <br />b. Two complete sets of revised construction drawings. <br />c. Two copies of supplemental structural calculations. <br />Submittal documents shall contain sufficient information and detail to review the proposed project <br />for compliance with the adopted codes. Upon submittal of the revised documents, your application <br />will be given priority and plan reviews will recommence. <br />Geotechnical <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.