My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1711 125TH PL SE 2024-11-15
>
Address Records
>
125TH PL SE
>
1711
>
1711 125TH PL SE 2024-11-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2024 9:13:19 AM
Creation date
7/19/2024 2:50:17 PM
Metadata
Fields
Template:
Address Document
Street Name
125TH PL SE
Street Number
1711
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. The typical garage section on Sheet P-7 should specify a baffle extending above the insulation <br />per WSEC Section R402.2.3. <br />ANS: Insulation in Garage attic is R-49 and baffle is extended above insulation details on <br />pg#8 <br />9. Sheets P-2 and P-4 state the project involves modifying 463 SF. However, the previously <br />permitted garage spaces in not legal. The total gross converted space is 572 SF (approximately <br />540 interior net space). The house is required to have a whole house ventilation system. This <br />may be addressed on Sheet P-5, but it is not clear. The drawings should include a clear <br />statement to provide a whole house ventilation system and specify the system requirements. <br />See Section R303.4. <br />ANS: Gross project SQ Ft is 540 <br />Sheet P-4 appears to show structural modifications on the north and west sides of the building. <br />The modifications should be clearly stated in the plans. The plans should clearly delineate <br />between new and existing work. Infilled wall areas and previously unpermitted wall <br />modifications should be shown as new construction. All previous unpermitted walls should be <br />shown as new work. See Section R106.1.1 <br />ANS: Existing partition on p-4 will be remove/replaced, Existing proposed bathroom has not <br />been permitted will remain seeking permit for bathroom and any pier work in that area. <br />2. The garage is required to provided brace walls per Section R602.10. The locations of the <br />panels and the type(s) of construction should be specified. Details should be provided. See <br />Sections R102.7.1, R106.1.1, and R106.1.3. <br />ANS: See pg# 7 for wall bracing <br />3. The required construction and details for the ramp and deck are not complete. See Section <br />R507. The following comments should be addressed: <br />a. The ramp framing is not complete. The joist spacing is not specified. The center joist does <br />not appear to have intermediate support along its length; the span(s) is not defined. <br />b. The maximum ramp slope should be specified. <br />c. The ramp width should be specified. <br />d. Details are required for the guards. The guards, connections to the supporting framing, and <br />supporting framing should be designed to resist a minimum 200 lb load per Table R301.5. <br />e. Details are required for the handrails along the ramp. <br />ANS: Ramp & Deck Detail on pg #13 <br />Respectfully, <br />Jerome Jackson <br />3 I i� <br />
The URL can be used to link to this page
Your browser does not support the video tag.