MASONRY OBSERVATIONS REPORT MAYES I lrerracon <br /> Report Number: M7211390.0066 <br /> Service Date: 05/19/22 20225 Cedar Valley Rd Ste 110 <br /> Report Date: 05/23/22 Lynnwood,WA 98036-6365 <br /> 425-742-9360 <br /> Client Project <br /> Vanir Construction Management Inc. Merrill Creek Operations Base Main &Ops Bldg Exp Phase 3 <br /> Attn: John Wright 7000 Hardeson Road <br /> 707 S. Grady Way, Suite 120 use middle driveway off 7100 Hardeson Road <br /> Renton,WA 98057 Everett,WA <br /> Project Number: M7211390 <br /> Permit No.: B2101-003 <br /> GENERAL INFORMATION <br /> John with Vanir Construction Management requested Mayes/Terracon be on site for Masonry Observation of the <br /> following elements: Walls. These elements are being constructed by Henson. The results of observation(s) for <br /> today were reported to John with Vanir Construction Management. <br /> The construction documents referenced for this inspection include: Structural plans. <br /> MASONRY OBSERVATIONS <br /> Control Weather <br /> Construction Masonry Block Block Joints Procedures <br /> Type Type Elevation/Location Size Type Observed Followed? Status Comments <br /> Walls CMU Level 1, 8"and 10"walls at 8", 10" Normal Yes Yes Complies First lift up to <br /> grid lines N/1-4 Weight 5'4" <br /> Two sets of(3) masonry prisms were prepared by the masonry contractor and grouted today, (1) for the 8" wall <br /> and (1) for the 10" wall. Grout was placed via line pump and vibrated for consolidation. Reinforcing steel was <br /> placed per plans. <br /> COMPLIANCE STATEMENT <br /> Based on our observations, masonry activities observed at the above-referenced locations appeared to be <br /> completed in general accordance with the project plans and specifications. <br /> Services: Special Inspections/Materials Testing <br /> Mayes/Terracon Rep.: Michael Mattox <br /> Reported To: Vanir Construction Management Inc. <br /> Contractor: Henson <br /> Report Distribution: <br /> (1)Vanir Construction Management (1)City of Everett WA,Kurt Keck <br /> Inc.,John Wright <br /> (1)Community Transit,Larry (1)Jimale Technical Services LLC, Reviewed By: <br /> Daubenmire Tom Donnelly - <br /> (1)Mayes Testing Engineers,Inc, (1)Mayes Testing Engineers,Inc, Barry Tuttle <br /> Donna Pollard Todd Wirtz <br /> (1)Vanir Construction Management (1)Vanir Construction Management Project Field Manager <br /> Inc.,Dan McNay Inc.,John Turk <br /> The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client <br /> indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to <br /> the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br /> CT0001,10-16-13,Rev.10 Page 1 of 1 <br />