Laserfiche WebLink
CROSS-TIE PIPELINE DESIGN <br /> Description: A pipeline connecting P/L #2 & #3 within P/L #5 <br /> Location: At Snohomish <br /> Justification: (Need/Demand) Needed to increase capacity to deliver water <br /> down P/L #5 <br /> Amounts in $1,000 <br /> ,00040 t <br /> Land&right-cf-ay $0 <br /> Desigi&E ix$neering $300 $300 <br /> Construction $0 <br /> Other $0 <br /> $0 <br /> Total $0 $0 $0 $0 $0 $300 sax) <br /> ` 00141,999 Ixok s-g.i;a,+ 2001 3 F 4 ?4111{.2003-NW%2C01:44Wrciall4f <br /> General Fund $0 <br /> Mtigation Fees $0 <br /> Assessments $0 <br /> Grants $0 <br /> Rates $300 $300 <br /> Other $0 <br /> $0 <br /> Total $0 $0 $0 $0 $0 $300 $300 <br />