My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2118 JEFFERSON PL 2024-10-25
>
Address Records
>
JEFFERSON PL
>
2118
>
2118 JEFFERSON PL 2024-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2024 7:51:43 AM
Creation date
7/30/2024 10:12:09 AM
Metadata
Fields
Template:
Address Document
Street Name
JEFFERSON PL
Street Number
2118
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> 1 of 1 <br /> OCT 1 1 ,'02.3 \�,' % EC a VED <br /> CITY O EVERETT _ AUG 3 0 2023 <br /> Permit Services <br /> CITY OF EVERETT <br /> Permit Services <br /> LONGITUDE <br /> ONE TWENTY° <br /> ENGINEERING&DESIGN <br /> August 29th, 2023 <br /> The purpose of this letter is to address comments from City of Everett dated August 22nd, 2023, regarding <br /> the foundation stabilization work for the residence located at 2118 Jefferson P1, Everett, WA 98203. The <br /> comments are restated below for your convenience followed by a response by L120 Engineering& Design. <br /> Review Comment: <br /> 1. It appears that the channel installation at helical piles 1-2,3-4,and 5 are at the garage foundation which <br /> is presumed to have a slab on grade, but on sheet SD-1.1, the detail 2 section with the continuous <br /> channel is at a foundation with a crawl space. Can you clarify the detail of the installation of the <br /> channel and revise as necessary? <br /> L120 Response: The detail of the installation of a C Channel on a slab on grade has been included <br /> in the revised plan. Please see the updated drawing package dated August 29th, 2023. <br /> 2. On sheet SD-1.1, details 2 and 3 appear to have conflicting anchorage information as detail 2 shows <br /> two anchors vertically spaced on either side of the center line of the channel while detail 3 only has an <br /> anchor at the centerline of the channel. Please revise as required for clarity. <br /> L120 Response: The previous submission contained an error by including this detail, it has been <br /> removed. Please see the updated drawing package dated August 29th, 2023. <br /> 3. On the site plan(R&R Level Survey)it indicates that an area highlighted in green is to have polyurethane <br /> foam injection, but in the calculation package, JOB PHOTOS, the garage photo indicates the home- <br /> owner will be removing and replacing the garage slab. Can you clarify if the site plan is accurate and <br /> revise as necessary? <br /> L120 Response: The Level Survey pages in the Calculation package has been revised with the <br /> polyurethane removed from the scope of work. Please see the updated package dated August 29th <br /> 2023. <br /> Please let us know if you have any questions. Thank you for your time in reviewing this response. <br /> Sincerely, <br /> Jason Tien • R 4 • <br /> L120 Engineering & Design (L120) , H(+ • <br /> jtienu1120engineering.com • ? r,f'1d ,'�t. V, • <br /> efc. < * C` <br /> 11 <br /> Mans R. Thurfjell, P.E. . j. �' <br /> L120 Engineering &Design (L120) <br /> r r <br /> inthurfjell91120engineering.com -0 � <br /> • <br /> -26i 636 3313 <br /> 9 L12CEng:neering.corn <br />
The URL can be used to link to this page
Your browser does not support the video tag.