Laserfiche WebLink
VIEW KEY <br />= LEVEL NAME <br />Q~ INDICATES NOTE USED TO DESCRIBE <br />1.NAME <br />"HEIGHT ABOVE <br />ADDITIONAL INFORMATION ABOUT <br />PROJECT 0'-0" <br />WORK REQUIRED, SPECIFIC TO THE <br />SHEET AND/OR DETAIL <br />INDICATES DIRECTION OF TRUE NORTH <br />PLAN OR DETAIL NUMBER <br />PLAN OR DETAIL NAME <br />VIEW NAME <br />PLAN OR DETAIL SCALE <br />MpRj� <br />INDICATES SIMILAR DETAIL <br />SIM REFERENCED IN MULTIPLE LOCATIONS <br />DETAIL REFERRED TO BY SECTION CUT <br />1 <br />M701 SHEET DETAIL IS LOCATED ON <br />INDICATES SIMILAR DETAIL <br />IN MULTIPLE LOCATIONS <br />Sim'REFERENCED <br />1 DETAIL REFERRED TO BY ELEVATION <br />4 <br />3 T101� SHEET DETAIL IS LOCATED ON <br />LINE TYPE KEY: <br />NEW WORK BY THIS CONTRACTOR <br />(DARK SOLID LINE) <br />- - - - NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR <br />(DARK LONG DASHED LINE) <br />NEW WORK BY OTHERS AND/OR EXISTING TO REMAIN <br />(LIGHT SOLID LINE) <br />- - - - - - - EXISTING TO BE REMOVED BY THIS CONTRACTOR <br />(DARK SHORT DASHED LINE) <br />CONTRACTOR ABBREVIATION KEY <br />ABBR: <br />DESCRIPTION: <br />A.C. <br />ASBESTOS ABATEMENT CONTRACTOR <br />A.T.C. <br />AUTOMATIC TEMPERATURE CONTROL CONTRACTOR <br />A.V.C. <br />AUDIONISUAL CONTRACTOR <br />C.C. <br />CIVIL CONTRACTOR <br />C.M. <br />CONSTRUCTION MANAGER <br />E.C. <br />ELECTRICAL CONTRACTOR <br />F.P.C. <br />FIRE PROTECTION CONTRACTOR <br />F.S.C. <br />FOOD SERVICE CONTRACTOR <br />G.C. <br />GENERAL CONTRACTOR <br />H.C. <br />HEATING CONTRACTOR <br />M.C. <br />MECHANICAL CONTRACTOR <br />N.C.C. <br />NURSE CALL CONTRACTOR <br />P.C. <br />PLUMBING CONTRACTOR <br />S.C. <br />SECURITY CONTRACTOR <br />T.C. <br />TECHNOLOGY CONTRACTOR <br />T.C.C. <br />TEMPERATURE CONTROLS CONTRACTOR <br />V.C. <br />VENTILATION CONTRACTOR <br />MECHANICAL ABBREVIATION KEY <br />ABBR: <br />DESCRIPTION: <br />AD <br />ACCESS DOOR <br />AFF <br />ABOVE FINISHED FLOOR <br />C <br />COMMON <br />CO <br />CLEANOUT <br />CD-E <br />CEILING DIFFUSER - EXISTING <br />CFSD <br />CONTROURRE/SMOKE DAMPER <br />DEG (0-2") <br />DIFFERENTIAL PRESSURE GAUGE (RANGE) <br />DES <br />DIFFERENTIAL PRESSURE SWITCH <br />EA <br />EXHAUST/RELIEF AIR <br />ECFSD <br />EXISTING CONTROL FIRE SMOKE DAMPER <br />EFD <br />EXISTING FIRE DAMPER <br />EFSD <br />EXISTING FIRE SMOKE DAMPER <br />EP <br />ELECTRICAL TO PNEUMATIC VALVE <br />ESD <br />EXISTING SMOKE DAMPER <br />FD <br />FIRE DAMPER <br />FOB <br />FLAT ON BOTTOM <br />FOT <br />FLAT ON TOP <br />FSD <br />FIRE/SMOKE DAMPER <br />MA <br />MIXEDAIR <br />MV <br />MIXING VALVE <br />NC <br />NEW CONNECTION <br />N.C. <br />NORMALLY CLOSED <br />NIC <br />NOT IN CONTRACT <br />N.O. <br />NORMALLY OPEN <br />OA <br />OUTSIDEAIR <br />PS <br />PRESSURE SWITCH <br />RA <br />RETURN AIR <br />SA <br />SUPPLYAIR <br />SD <br />SMOKE DAMPER <br />TAB <br />TERMINALAIR BOX <br />TO <br />TRANSFER DUCT <br />TYP <br />TYPICAL <br />UC-1 <br />DOOR UNDERCUT BY OTHERS (1- TYPICAL) <br />UNO <br />UNLESS NOTED OTHERWISE <br />MECHANICAL SYMBOL LIST <br />NOT ALL SYMBOLS MAY APPLY. <br />SYMBOL: <br />DESCRIPTION: <br />CR <br />CONDENSER WATER RETURN <br />-CS- <br />CONDENSER WATER SUPPLY <br />-CWR- <br />CHILLED WATER RETURN <br />-CWS- <br />CHILLED WATER SUPPLY <br />DRAIN <br />-D- <br />-G- <br />NATURAL GAS <br />-HWR- <br />HEATING WATER RETURN <br />-HWS- <br />HEATING WATER SUPPLY <br />PIPE CAP <br />� <br />O <br />PIPE DOWN <br />PIPE UP OR UP/DOWN <br />-----0 <br />t_ <br />PITCH PIPE IN DIRECTION <br />DIRECTION OF FLOW IN PIPE <br />NEW CONNECTION <br />DIELECTRIC CONNECTION <br />UNION/FLANGE <br />�4- <br />SHUTOFF VALVE NORMALLY OPEN <br />SHUTOFF VALVE NORMALLY CLOSED <br />pd <br />THROTTLING VALVE <br />BALANCING VALVE (NUMBER INDICATES GPM) <br />d1h <br />AUTOMATIC BALANCING VALVE <br />MIXING VALVE <br />CONTROL VALVE (THREE-WAY) <br />1�4 <br />CONTROL VALVE (TWO-WAY) <br />SOLENOID VALVE <br />CHECK VALVE <br />METER <br />DIRECTION OF AIR FLOW <br />FLEXIBLE DUCT <br />MANUAL VOLUME DAMPER <br />T <br />RISE IN DIRECTION OF AIR FLOW <br />DROP IN DIRECTION OF AIR FLOW <br />DUCT CAP <br />DUCT DOWN <br />DUCT UP <br />SUPPLY/OUTSIDE AIR DUCT SECTION <br />® <br />RETURN AIR DUCT SECTION <br />® <br />EXHAUST/RELIEF AIR DUCT SECTION <br />® <br />4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION <br />CD-1 <br />6/115 <br />AIR TERMINAL PROPERTIES SYMBOL <br />NECK SIZE/CFM <br />0T <br />THERMOSTAT/SENSOR <br />Q <br />TEMPERATURE SENSOR <br />CONTACT PERSONS: <br />DESCRIPTION: <br />PERSON: <br />PROJECT MANAGER <br />ASHLEE DOWNHAM <br />MECHANICAL <br />ANDY NACHTRAS <br />ELECTRICAL <br />ASHLEE DOWNHAM <br />MECHANICAL SHEET INDEX <br />MO <br />MECHANICAL COVER SHEET <br />M1 <br />MECHANICAL DEMOLITION PLAN <br />M2 <br />MECHANICAL PLAN <br />M3 <br />MECHANICAL AND PLUMBING DETAILS AND SCHEDULES <br />M4 <br />MECHANICAL SCHEDULES <br />M5 <br />MECHANICAL AND PLUMBING SPECIFICATIONS <br />P1 <br />PLUMBING DEMOLITION PLAN <br />P2 <br />PLUMBING PLAN <br />GRAND TOTAL: 8 <br />MECHANICAL RENOVATION NOTES: <br />THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED <br />TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL. <br />1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD <br />SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND <br />REPORT ANY CONFLICTS BEFORE PROCEEDING. <br />2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS <br />BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK. <br />3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE <br />FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD <br />CONDITIONS <br />4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK <br />AND SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE <br />REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER AREA OF <br />WORK. <br />5. EACH CONTRACTOR SHALL CUT AND PATCH ROOFS, WALLS, AND FLOORS ASSOCIATED <br />WITH HIS WORK. <br />6. EACH CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS, <br />CEILING TILES AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL <br />CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO <br />BIDDING. <br />7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH <br />NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL <br />EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT <br />DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL <br />SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK. <br />8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING <br />CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT <br />REMAIN ACTIVE. <br />9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY <br />REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW <br />SYSTEMS ARE INSTALLED. <br />10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR <br />TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND <br />CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY <br />DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE. <br />11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT <br />THAT HAS BEEN REMOVED. <br />PLUMBING GENERAL NOTES: <br />1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR. <br />CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR <br />FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT. <br />2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO <br />THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS <br />RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN <br />THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES <br />PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER LISTED IS THE <br />BASIS OF DESIGN. <br />3. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL <br />APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES. <br />4. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874 <br />5. VERIFY UNDERGROUND PIPE SIZES, INVERT ELEVATIONS, AND LOCATIONS PRIOR TO <br />BEGINNING ANY WORK. <br />6. REFER TO THE PLUMBING FIXTURE SCHEDULE FOR THE SIZES OF BRANCH PIPES TO <br />PLUMBING FIXTURES. <br />7. FOR CLARITY, NOT ALL VALVES HAVE BEEN SHOWN. PROVIDE SHUTOFF VALVES IN <br />DOMESTIC WATER PIPING SERVING EACH ROOM WITH FIXTURES. ANGLE STOPS SHALL NOT <br />BE CONSIDERED SHUTOFF VALVES. <br />8. EXISTING CONDITIONS ON DEMOLITION PLANS ARE PROVIDED TO INDICATE THE GENERAL <br />SCOPE OF ITEMS TO BE REMOVED. REFER TO SPECIFICATIONS FOR ADDITIONAL <br />DEMOLITION INFORMATION. <br />9. P.C. SHALL CUT AND PATCH EXISTING AS REQUIRED FOR NEW OR DEMOLITION WORK <br />UNLESS NOTED OTHERWISE. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. <br />PLUMBING SYMBOL LIST <br />NOT ALL SYMBOLS MAYAPPLY. <br />SYMBOL: DESCRIPTION: <br />---CW- <br />COLD WATER -POTABLE <br />-HW- <br />HOT WATER -POTABLE <br />-SAN- <br />SANITARY DRAINAGE <br />-V- <br />VENT <br />PIPE CONTINUATION <br />PIPE CAP <br />D <br />PIPE DOWN <br />-O <br />PIPE UP OR UP/DOWN <br />-- <br />NEW CONNECTION <br />UNION/FLANGE <br />-I- <br />DG <br />SHUTOFF VALVE NORMALLY OPEN <br />SHUTOFF VALVE NORMALLY CLOSED <br />VENTILATION GENERAL NOTES: <br />1. THE SIZE OF EACH BRANCH DUCT TO A TERMINAL AIR BOX (TAB) SHALL MATCH THE TAB'S <br />INLET SIZE UNLESS THE BRANCH IS GREATER THAN 6 FEET IN LENGTH, IN WHICH CASE THE <br />BRANCH SHOULD BE INCREASED ONE DUCT SIZE, OR NOTED OTHERWISE. <br />2. ALIGN TEMPERATURE SENSORS WITH LIGHT SWITCHES AND WHEN IN CLOSE PROXIMITY TO <br />EACH OTHER. <br />3. PROVIDE ACCESS DOORS AT ALL DUCT MOUNTED EQUIPMENT. <br />4. EXISTING AIR INLET AND OUTLET CFM SHOWN ON DRAWINGS ARE FROM EXISTING <br />DRAWINGS, AND ARE FOR REFERENCE ONLY. CONTRACTOR SHALL USE PRE -BALANCE <br />VALUES, AND NOT EXISTING CFM SHOWN ON DRAWINGS. <br />5. CONTRACTOR MAY REUSE PORTIONS OF EXISTING DUCT PROVIDED SIZES AND PRESSURE <br />CLASSES ARE CORRECT, DUCT IS THOROUGHLY CLEANED AND FREE OF DEFECTS, AND ALL <br />TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS ARE SEALED <br />AS SPECIFIED FOR NEW DUCTWORK. <br />TAB PRE -DEMOLITION NOTES: <br />1. BEFORE ANY DEMOLITION WORK IS BEGUN A COMPLETE AIR BALANCE TEST SHALL BE <br />PERFORMED BY THE TESTING, ADJUSTING AND BALANCING (TAB) CONTRACTOR ON <br />EXISTING AIR HANDLERS AND EXHAUST FANS SERVING THE AREAS AFFECTED BY <br />CONSTRUCTION. EQUIPMENT TO BE DEMOLISHED DOES NOT REQUIRE TESTING. PROVIDE <br />AIR BALANCE TESTING ONLY ON EQUIPMENT THAT WILL CONTINUE TO BE USED TO SERVE <br />RENOVATED AREAS AFTER THE CONSTRUCTION PHASE IS COMPLETED. <br />TAB POST -CONSTRUCTION NOTES: <br />1. AFTER CONSTRUCTION ACTIVITIES ARE COMPLETE, TESTING, ADJUSTING (TAB) AND <br />BALANCING CONTRACTOR SHALL REBALANCE AIR HANDLING UNITS AND EXHAUST FANS AS <br />REQUIRED TO ACHIEVE THE NEW AIRFLOW VALUES SHOWN ON THE CONSTRUCTION <br />DRAWINGS. <br />2. IF DUCT TRAVERSE LOCATION AS MARKED ON THE DRAWINGS IS INACCESSIBLE FOR <br />MEASUREMENT, THE TAB CONTRACTOR SHALL PERFORM THE TRAVERSE AT AN ALTERNATE <br />LOCATION OR SHALL TAKE MULTIPLE DUCT TRAVERSES AND/OR GRILLE READINGS AS <br />REQUIRED TO DETERMINE THE FLOW RATE. IN THE EVENT TRAVERSES ARE TAKEN AT AN <br />ALTERNATE LOCATION(S), TAB CONTRACTOR SHALL INCLUDE A DRAWING THAT SHOWS THE <br />LOCATIONS WHERE THE ACTUAL MEASUREMENTS WERE TAKEN. <br />3. A DUCT STATIC PRESSURE READING SHALL BE TAKEN AT EACH LOCATION WHERE A DUCT <br />TRAVERSE READING IS TAKEN AND SHALL BE INCLUDED IN THE FINAL POST -CONSTRUCTION <br />TAB REPORT. <br />4. TAB CONTRACTOR SHALL COMPILE AND SUBMIT COPIES OF THE FINAL POST - <br />CONSTRUCTION TAB REPORT AS REQUIRED BY SPECIFICATIONS. <br />5. THE FINAL POST CONSTRUCTION REPORT SHALL INCLUDE ALL ITEMS REQUIRED IN THE <br />SPECIFICATIONS. <br />MECHANICAL GENERAL NOTES: <br />THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED <br />TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL. <br />1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE <br />DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS. <br />DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC., <br />AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE <br />INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING <br />CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT. <br />2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM <br />ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR <br />PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES. <br />3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE <br />CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO <br />VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO <br />VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES <br />OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING <br />WITH FABRICATION OR EQUIPMENT ORDERS. <br />4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE <br />REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER <br />ACCESS. <br />5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO <br />COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR <br />EXPENSE TO OTHERS. <br />6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL <br />CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF <br />DESIGN. <br />7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY <br />AUDIONISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING <br />MOUNTED DEVICES, OTHER THAN SPRINKLERS. <br />8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS, <br />FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS <br />RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND <br />FINISH. <br />9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE <br />GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE <br />PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS <br />PANELS PRIOR TO BIDDING. <br />10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING, <br />AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE <br />SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER <br />FOR OUTDOOR USE. <br />11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON -FIRE RATED WALL, <br />PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE <br />TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS <br />WITHIN ROOMS. <br />12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED <br />OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL <br />RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT. <br />13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT <br />MANUFACTURERS, CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND <br />REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS, <br />PIPING, DUCTWORK, ETC. <br />14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES. <br />15. MAINTAIN MINIMUM T-6" CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR <br />STARTERS, SWITCHES, AND DISCONNECTS. <br />16. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL <br />EXTEND MINIMUM 6" BEYOND ALL SIDES OF EQUIPMENT. <br />17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER <br />NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE <br />CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS. <br />18. ALL DUCT DIMENSIONS SHOWN ARE INSIDE CLEAR DIMENSIONS. <br />�I,blc LAWRENCE <br />GROUP <br />St. LOUTS <br />319 North 4th Street <br />Suite 1000 <br />St. Louis, Missouri 63102 <br />(314)231-5700 <br />PROJECT TEAM: <br />GENERAL CONTRACTOR: <br />TBD <br />PROFESSIONAL ENGINEER: <br /><:IMEG <br />IMEG <br />7600 E Orchard Road, Suite 250-S <br />Greenwood Village, CO 80111 <br />Phone: 303.796.6000 <br />MEG Project No.: 23000048.10 <br />PROFESSIONAL SEAL: <br />E <br />ob <br />P <br />ONA E? <br />0_1,Z4.Z0Z3 <br />EXf. o�l. r o•z 024 <br />PROJECT TITLE'. <br />���11M <br />o <br />rn <br />/ <br />Q <br />� <br />H <br />ILLI <br />■ - <br />LU <br />W <br />W <br />/ <br />!Y O <br />O <br />LL <br />H <br />Z <br />W <br />0 <br />W <br />O <br />U <br />W' M <br />W <br />Z <br />W <br />W <br />m <br />J <br />Q <br />of <br />of <br />W <br />O <br />M <br />M <br />m <br />C-4 <br />O = <br />N <br />The Professional Architect's seal aifbed W this sheet <br />applies ony W the material a,M items shmn on this <br />sheet All d-ing, inetrumenteorotherdocumente mt <br />exhibiting this seal shall note conside,ed prepared by <br />Wis aron¢ea,and thisa Nlh ..preset, diaolalmaany <br />and all responsibility for such plans, dmwings or <br />documents rot exhibiting this seal. <br />This dewing and deWils on it are the sole property of Ue <br />aroh-and may be aced fe, this ape &project. ly <br />It shall not be loaned, copied or reproduced, In 1 or <br />pad, or for any other purpose or project without the <br />wWa n mnaent of the a &-t. <br />No Description <br />Date <br />SHEETTITLE: <br />MECHANICAL COVER <br />SHEET <br />PROJECT NUMBER: SHEET NUMBER: <br />2021932.001 <br />D.- By. <br />ABN 0 <br />I... Dace: <br />May 23, 2023 <br />